Similar Projects
Reported | 01/23/2019 12:00 AM |
Project Title | Progressive Design-Build Services for Mount Holly Pumping Station and Force Main |
Physical Address | View project details and contacts |
City, State (County) | Charlotte, NC (Mecklenburg County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Lift and Pump Stations |
Contracting Method | Design-Build. Competitive Bids. |
Project Status | Accepting Qualifications |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Progressive Design-Build services to design and construct the wastewater conveyance infrastructure for the Mount Holly Pumping Station and Force Main Project (Project). This Project is necessary to transfer wastewater flow from the existing City of Mount Holly Wastewater Treatment Plant (Mt. Holly WWTP) to the existing Long Creek Pumping Station (PS). The Mt. Holly WWTP is owned and operated by the City of Mount Holly (Mt. Holly), but this project will provide the infrastructure to allow the Mt. Holly WWTP to be decommissioned. All wastewater flow will be pumped to the Long Creek PS via force mains under the Catawba River. Respondents will need to assemble a team of experts, including but not limited to, design, survey, geotechnical, environmental, permitting, public communications, construction, start-up, and commissioning, for the execution of this project. The overall budget is $32.3 million, with the Mount Holly component limited to $14.375 million. | ||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |