Similar Projects
Melvin Price Lock & Dam Reach 2 Flood Control Relief Wells
Alteration
Design
Alton, IL 62002

Water System Improvements Division C: Ground Storage Tank Improvements
Infrastructure
Bidding
Moweaqua, IL

Water System Improvements Division 1 Well Building and Aerator Replacement
Infrastructure
Bidding
Macon, IL

New 250,000 Gallon Elevated Water Storage Tank
Post-Bid
Less than $1,310,000 est. value
Carrollton, IL

Engineering, Design, and Construction Services for New Deep Well #19
Post-Bid
Crystal Lake, IL

183 CES Repair Boilers & Pumps P-48
Results
$100,000 to $250,000 est. value
Springfield, IL 62707

Chemical Treatment of Deep Wells
Results
East Saint Louis, IL

Water Tower Cleaning
Infrastructure
Bidding
Collinsville, IL

Protective Coating Restoration for 500,000 Gallon Elevated Water Storage Reservoir Along with Ground Storage Reservoir and Miscellaneous Concrete at Water Treatment Plant
Post-Bid
Centralia, IL

New Ground Water Storage Tank
New Construction, Demolition
Results
Loda, IL 60948

Replacement of Media in the Iron Filter at Well 5
Infrastructure
Bidding
$392,000 est. value
Fox Lake, IL

Water System Improvements Division 2: Water Tower Rehabilitation
Post-Bid
Blue Mound, IL

Concrete Repair and Epoxy Coating of Wet Wells and Screen Channels
Results
Less than $840,000 est. value
Gurnee, IL 60031

Construction of Painting the Interior and Exterior of Existing Ground Storage Tank, Remove and Replace the Ground Storage Tank Roof
Infrastructure
Bidding
$450,000 est. value
Moweaqua, IL

East Stl Bp 12 Phase 1 Relief Wells
Post-Bid
$10,000,000 to $15,000,000 est. value
Madison, IL

Last Updated 04/20/2022 11:48 AM
Project Title

Water System Improvements New Ground Storage Tank, New WTP Filter & Controls

Physical Address View project details and contacts
City, State (County) Bluffs, IL   (Scott County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,060,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of the existing 80,000 gallon ground storage tank with a 150,000 gallon ground storage tank, replacement of two high service pumps, installation of a telemetry system to monitor tank levels at the WTP, new filter and media replacement in existing filters at the water treatment plant.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Division 46 - Water and Wastewater Equipment, Filtration Equipment, Filter Media.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents