Similar Projects
Sanitary Sewer Improvement
Bidding
Bourbon, IN

2021 Manhole Rehabilitation
Bidding
New Whiteland, IN

Collection System Improvements
Post-Bid
New Palestine, IN 46163

Jeffersonville CSO Storage Interceptor Phase 3
Post-Bid
Jeffersonville, IN

Madison Street and 65th Lane Sanitary Sewer Improvement
Results
Merrillville, IN 46410

LTCP Phase 5 - South Region CSO Abatement
Results
Noblesville, IN 46060

Monroe Manor Sewer Separation - Phases 2 and 3
Bidding
La Porte, IN

Hessen Cassel Storm and Sidewalk Improvements
Post-Bid
Fort Wayne, IN 46800

Montgomery Avenue and Storm Line
Results
$1,000,000 est. value
Clarksville, IN 47129

BL000B Multi-Building Sanitary Sewer Inspection and Repairs
Bidding
Bloomington, IN

Sewer Construction Material
Term Contract
Post-Bid
Fort Wayne, IN

Sanitary Sewer Extension at the Shelbyville AASF/Readiness Center
Results
Shelbyville, IN 46176

Sanitary Main and Three Phase Extension
Bidding
Indianapolis, IN

Cass Street Bottleneck Removal
Post-Bid
Peru, IN

I-69 / SR 64 South East Quadrant Sanitary Sewer - Phase 1
Results
$470,000 to $530,000 est. value
Princeton, IN 47670

Reported 04/29/2021 12:00 AM
Project Title

Green Springs Valley Trunkline Upgrades

Physical Address View project details and contacts
City, State (County) Newburgh, IN   (Warrick County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes,but is not limited to:Installation of approx.230LF of24” gravity sewer main,2,800LF of18”gravity sewer main,1,300 LFof15”gravity sewer main,2,700LF of12”gravity sewer main,60LF of10”gravity sewermain,560LF of 8”gravity sewer main,and750LF of 6”gravity sewer laterals;approx.120LF of28”steel casing pipe(open cut),130LF of28”steel casing pipe(jack&bore),180LF of24”steel casing pipe(open-cut),165LFof steelcasing pipe (jack&bore),80LF of22”steel casing pipe(open-cut), 60LF of18”steel casingpipe (jack&bore);38-48”Diameter Manholes,2 60”Diameter Manholes,externald rops;approx.4,150LF ofexisting gravitysewer removal; groutfill of3,500LF ofexisting gravity sewer; Approx.1200LF of removal of retired22”Marathon pipeline; Removal/Retirement of 29 Existing Manholes;Removeandreset existing fences,yardbarns, and miscellaneous yard items;asphalt restoration;concreted riverestoration;granular and flowablebackfill;by pass pumping;clearing and grubbing;erosion control;final grading and seeding;traffic control;and all other work required for the complete installation.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents