Similar Projects
Last Updated | 02/11/2020 09:16 AM |
Project Title | Pavement and Rehabilitation, North VIII, 2018 |
Physical Address | View project details and contacts |
City, State (County) | DE (New Castle County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Consist of furnishing all labor and materials for an auxiliary lane along southbound SR 1 so that the on-ramp at the SR 273 interchange would be a continuous lane through to the US 40 interchange. In order to construct an acceptable auxiliary lane, the following improvements will have to be made: widening of existing shoulder, overlay of existing pavement, existing ditches and side slopes to be regraded; existing lighting and overhead sign structures to be relocated, and other miscellaneous improvements, and other incidental construction in accordance with the location, notes and details shown on the plans and as directed by the Engineer. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |