Similar Projects
New Fire Department Headquarters
New Construction
Conception
McKinney, TX

Fire Station #6
New Construction
Conception
Mansfield, TX

Fire Station 2
New Construction
Design
$4,500,000 est. value
Humble, TX 77338

Fire Station #43
New Construction
Design
$5,000,000 est. value
Fort Worth, TX

DPS Police Outdoor Range Upgrade
Renovation - 8,545 SF
Bidding
$6,597,777 est. value
Euless, TX 76040

Design Build - El Paso Public Safety Training Academy and Fire Department Headquarters
Renovation
Bidding
$33,000 est. value
El Paso, TX

Fire Station No. 9 - GMP #1
New Construction
Sub-Bidding
$1,361,694 est. value
Denton, TX

New Public Safety Training Center
New Construction
Post-Bid
Less than $7,000,000 est. value
Texas City, TX

City of Duncanville Fire Station #1
New Construction - 15,500 SF
Post-Bid
Duncanville, TX 75116

Fire Station 24 Replacement Project
New Construction, Term Contract - 16,270 SF
Results
Less than $5,900,000 est. value
San Antonio, TX 78200

Fire Station 136 Renovation
Renovation - 4,351 SF
Results
TX

Police Headquarters and Fire Station #2 and Administration Buildings
New Construction - 73,273 SF
Construction
Less than $19,700,000 est. value
Huntsville, TX 77340

Shari D. Coleman Animal Shelter & Adoption Center And Fire Station #4
New Construction - 31,200 SF
Construction
Less than $15,400,000 est. value
Pearland, TX

Fire Station #7
New Construction - 14,300 SF
Pending Verification
Pearland, TX

Police Training Center
Renovation - 1,700 SF
Pending Verification
Pearland, TX

Reported 07/14/2022 09:06 AM
Project Title

Fire Station 2 - City of Liberty

Physical Address View project details and contacts
City, State (County) Liberty, TX 77575   (Liberty County)
Category(s) Government/Public
Sub-Category(s) Fire/Police Station
Contracting Method Competitive Bids.
Project Status Schematic Drawings, Construction Start Expected October 2022
Bids Due View project details and contacts
Estimated Value $6,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

An architect has been selected. As of July 13, 2022 general contractor bidding is not expected to commence before mid third quarter 2022. Although a firm schedule has not been established, construction is not expected to begin before early fourth quarter 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Fire/Police Station, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents