Similar Projects
Large Water Meters
Post-Bid
Less than $120,000 est. value
Pearland, TX

Coast Guard Station Freeport Waterline Repairs
Post-Bid
$10,000 to $25,000 est. value
Surfside Beach, TX 77541

Manvel Town Center Water Line Interconnect
Results
Manvel, TX 77578

Lift Station 1 and 4 Improvements
Results
Less than $161,000 est. value
TX

Water Production Facilities Rehabilitation
Post-Bid
Pearland, TX

Planing, Pavement Repair, Seal Coat and 1.5" HMA
Results
Less than $952,762 est. value
TX

Syrinix Pipeminder-H and S Units
Post-Bid
Houston, TX

Mill, Seal Coat and 1.5 in PFC Overlay
Results
$11,131,581 est. value
TX

Street Sweeping Services for Houston Public Works SW SE Quadrants
Term Contract
Post-Bid
Houston, TX

Add Shoulders, Seal Coat and 1.5 in ACP Overlay
Results
$13,064,714 est. value
TX

Hurricane Harvey`s FEMA Road Repairs
Post-Bid
$77,000 est. value
Freeport, TX 77541

Chocolate Bayou Detention Phase Three (Basin T Phase One) and Earthwork to Serve Meridiana
Results
TX

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Planing, Pavement Repair, Seal Coat and 1.5" ACP Highway:FM 2004
Results
Less than $1,620,857 est. value
TX

Water Service Connections
Infrastructure
Post-Bid
Houston, TX

Last Updated 09/01/2022 04:10 PM
Project Title

Mulberry Field Subdivision - Paving, Water Sanitary Sewer, Storm and Detention Including Storm Pump Station

Physical Address View project details and contacts
City, State (County) Angleton, TX 77515   (Brazoria County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Bids by Invitation
Project Status Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

For Mulberry Field Subdivision - Paving, Water Sanitary Sewer, Storm and Detention Including Storm Pump Station The deadline to ask questions is 9/06/2022 12:00 PM EST Notes: This is a private job so there will be no bid announcement. Results will be sent to bidders

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents