Similar Projects
600 BLK South Dooley Street and Sidewalk Improvements
Post-Bid
Grapevine, TX 76051

2021 Sidewalk Unit Price Contract
Post-Bid
Fort Worth, TX 76102

Installation of New Sidewalk in the City of Bedford Parks System
Results
Bedford, TX 76021

Bowman Branch Linear Park Trail
Results
$1,112,820 est. value
Arlington, TX

Cravens Park Trail Improvements
Results
$217,269 est. value
Arlington, TX 76018

2020 Paving and Sidewalk Improvements
Term Contract
Results
Fort Worth, TX 76102

Concrete Rehabilitation
Term Contract
Results
Fort Worth, TX 76135

Police Department Parking Lot Expansion
Results
$65,000 est. value
Saginaw, TX 76179

2020 Downtown Street Rehabilitation Contract 1
Results
Fort Worth, TX 76102

2020 Concrete Sidewalk, Accessibility Ramps, Concrete Street Panels, Driveway and Curb and Gutter Reconstruction at Various Locations
Results
Bedford, TX 76021

West Bank Renovation
Results
$1,200,000 est. value
Fort Worth, TX 76102

North Pate Orr Sidewalk Improvements Project
Results
$174,809 est. value
Keller, TX 76244

Parking Lot Modifications, Fort Worth DHQ
Results
Less than $1,242,628 est. value
Fort Worth, TX 76133

New Student Drop Off Lane Powell Intermediate School
Results
Fort Worth, TX 76140

Medlin Drive Sidewalk Improvements
Results
$342,342 est. value
Arlington, TX 76010

Last Updated 08/20/2020 12:33 PM
Project Title

Full Depth Reclamation of Parking Lot "C" Keller Sports Park

Physical Address View project details and contacts
City, State (County) Keller, TX 76244   (Tarrant County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $160,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Providing a full depth reclamation (FDR) of the Keller Sports Park Lot “C” at the Keller Sports Park including existing landscape island removal, tree, roots and root ball removal, providing a full depth reclamation of paving, base and subgrade material to a depth of twelve (12) inches, butt mill at all adjoining tie-ins, mixing with 6% Portland Cement (@ 65 lbs./SY), shape, grading, compaction, removal of top three inches, installing minimum 3 inch PVC sleeve for future irrigation piping, installation of header curb for landscape islands, shape, regrading and compaction of FDR areas obtaining 98% standard proctor density, sealing with prime coat @ 0.25 gallons per square yard and installing 3 inches (2 @ 1-1/2”) PG 70-22 Type D HMA, and installing ADA compliant handicap parking thermoplastic symbols and striping and providing for standard 9’ width by 18’ length parking stall installment with 4” with thermo striping and 12” stop bar striping at parking lot exit within a forty five (45) calendar day timeframe for reaching substantial completion and sixty (60) calendar days for final completion.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents