Similar Projects
Hampton Branch Rail Trail (NH Seacoast Greenway) - TSM-15-PL/NH-46 - City of Portsmouth
Infrastructure
Conception
$3,627,000 CJ est. value
Portsmouth, NH 03801

Hampton Branch Rail Trail (NH Seacoast Greenway) - TSM-15-PL/NH-46 - City of Portsmouth
Infrastructure
Conception
$3,627,000 CJ est. value
Portsmouth, NH 03801

Gateway at Exeter
New Construction - 48,560 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Exeter, NH 03833

74 Rockingham Road Residential Development
New Construction, Infrastructure - 13,816 SF
Design
$48,000,000 CJ est. value
Derry, NH 03038

Town Hall Annex Renovation
Renovation
Post-Bid
Rye, NH 03870

Construction Services for North Jetty Repairs in Hampton
Infrastructure
Post-Bid
$4,313,500 CJ est. value
Hampton, NH 03842

Parking Lot and Roadway Repaving - Seabrook Middle School
Infrastructure
Results
Seabrook, NH 03874

Parking Lot and Walkways Repaving - Lincoln Akerman School
Infrastructure
Results
Hampton Falls, NH 03844

Kelly's Roast Beef / Salem
New Construction, Infrastructure - 4,122 SF
Construction
$1,300,000 CJ est. value
Salem, NH 03079

Kelly's Roast Beef / Salem
New Construction, Infrastructure - 4,122 SF
Construction
$1,300,000 CJ est. value
Salem, NH 03079

Auto Owners Insurance Company Office
New Construction - 100,000 SF
Pending Verification
Londonderry, NH 03053

North Broadway Gas Station And Convenience Store
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Salem, NH 03079

US Route 1 New Sidepath Construction - TSM-08-PL/NH-56 - City of Portsmouth
Infrastructure
Conception
$1,425,000 CJ est. value
Portsmouth, NH 03801

Commercial Building Addition
Addition - 3,696 SF
Design
Derry, NH 03038

Installation of a Fiberglass, Thirty-thousand-gallon Cistern
Infrastructure
Post-Bid
$125,000 CJ est. value
Epping, NH 03042

Last Updated 05/02/2023 05:01 PM
Project Title

Industrial Drive Warehouse and Office Development

Physical Address View project details and contacts
City, State (County) Raymond, NH 03077   (Rockingham County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Office, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $270,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a 550,025 S.F. industrial distribution warehouse with associated loading 35 docks, truck parking, and employee vehicle parking. As of May 2, 2023, this project is in the planning stages, and waiting to receive approval from the Planning Commission. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been established.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

500,025 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents