Similar Projects
WTP Filter Repairs
Results
Ashland City, TN 37015

Rehabilitation of the Treatment Filters at the Water Treatment Plant
Post-Bid
Springfield, TN

South Clarksville Water Treatment Plant Upgrades
Renovation
Post-Bid
Clarksville, TN 37040

Screens for Headworks at Wastewater Treatment Plant
Term Contract
Results
Spring Hill, TN 37174

Chemicals for Water Resources
Renovation
Results
Murfreesboro, TN 37130

WWTP Sludge Thickening/Dewatering and UV Disinfection Facilities
Renovation, Infrastructure
Bidding
$8,000,000 est. value
Louisville, TN 37777

Wastewater Treatment Plant Aeration Equipment Replacement
Renovation
Results
Woodbury, TN

Wastewater Treatment Plant Grinder Installation
Renovation
Results
$54,000 est. value
Woodbury, TN 37190

Water Treatment Plant Filter No. 1 Rehabilitation
New Construction
Post-Bid
Spring City, TN

New Headworks
Results
$486,000 est. value
Celina, TN

Corrosion Inhibitor
New Construction
Bidding
Johnson City, TN

Reclaim Water Meters
New Construction
Post-Bid
Murfreesboro, TN 37130

SCADA System Upgrades
Post-Bid
Spring Hill, Thompson's Station, TN 37174

WTP Digester #5 Modifications
Renovation
Results
$80,000 est. value
Gallatin, TN

SCADA System Upgrades
Post-Bid
Spring Hill, Thompson's Station, TN 37174

Last Updated 06/29/2021 01:07 PM
Project Title

North Clarksville Water Treatment Plant

Physical Address View project details and contacts
City, State (County) Clarksville, TN   (Montgomery County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $100,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work to be performed under this Contract shall generally consist of following major work items: 1. Construction of a raw water pump station on Cumberland River, including an intake screen located in river, micro-tunnel from screen into a dry pit submersible raw water pump station, a pre-engineered metal building to house pump station ancillary equipment, and a separate pre-engineered metal building to house electrical components. 2. Construction of a pre-oxidation basin with geodesic dome cover, four flocculation basins, and four sedimentation basins. Flocculation and sedimentation basins shall be covered with a pre-engineered metal building with retractable solar screens. 3. Construction of a pre-engineered metal pretreatment building to house a polyaluminum chloride storage and feed system and associated flash mix pumps and appurtenances. 4. Construction of a pre-engineered metal building to house four new microfiltration membrane treatment units and associated chemicals and appurtenances, high service pumps, and membrane feed pumps. A pre-engineered metal Administration Building shall be attached to Membrane building comprising mainly offices, control and server rooms, restrooms and showers, and laboratory areas (including laboratory gas storage). 5. Construction of a pre-engineered metal building to house pressurized granular activated carbon (GAC) contactors. 6. Construction of a masonry building to house a fluoride feed system. 7. Construction of an above-ground, pre-stressed concrete clearwell. 8. Construction of a two-story concrete and masonry building to house solids handling equipment including centrifuges, centrifuge feed pumps, and polymer feed equipment and a drive-through truck bay. Solids handling facility shall also have a control room, restroom and shower, and laboratory. 9. Construction of gravity thickener tanks, process waste pump station to receive all process residuals for conveyance to thickeners, and a backwash recovery pump station for recycling membrane backwash, GAC backwash, centrifuge centrate, and thickener decant to pre-oxidation basin. 10. Construction of a pre-engineered metal building to house maintenance equipment. 11. Construction of backup power generator stations (one at raw water pump station and one at main water plant site). 12. Construction of all associated civil, process, structural, mechanical, electrical, plumbing, and instrumentation systems required for new facilities.

Details

Water Treatment Plant, New Construction.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents