Similar Projects
Turner Brewer Septic and WPS
Alteration
Design
$25,000 to $100,000 est. value
Roy, WA

Rockwood Retirement Communities Infrastructure & Communications
Infrastructure
Design
Spokane, WA 99218

American Rescue Plan Expenditure Category Addressing Drinking Water Transmission
Infrastructure
Bidding
Spokane, WA

Frontier Park Horse Arena Cover
Alteration
Bidding
$1,600,000 est. value
WA

Consultant Services for Water System Spring Box Upgrades
Infrastructure, Alteration
Post-Bid
Concrete, WA

Reservoir Transmission Main Replacements
Alteration
Post-Bid
Douglas, Wenatchee, WA

Water Meter Changeout
Infrastructure
Results
WA

2021 Capital Improvement - 32nd Street SE Highway 9 Crossing Water Main Project
Infrastructure
Results
$250,000 est. value
Lake Stevens, WA 98258

NorthEast 2nd Avenue Street Improvements and NorthEast Dallas Water Improvements
Infrastructure
Bidding
$365,315 est. value
Camas, WA

Sedgwick Road Watermain Relocation
Infrastructure
Post-Bid
Port Orchard, WA

Louis Thompson Tightline
New Construction, Infrastructure
Results
$5,800,000 est. value
Sammamish, WA 98074

2022 Valve and Manhole Adjustment Project
Infrastructure
Bidding
$325,000 est. value
Bothell, WA

SR 224 Van Giesen Improvement Phase One
Infrastructure
Post-Bid
West Richland, WA

Lead Service Line Replacement
Alteration
Results
$4,600,000 to $5,800,000 est. value
Auburn, WA 98092

2022 Sewer and Water System Improvements
Infrastructure
Bidding
$2,800,000 to $3,100,000 est. value
Omak, WA

Last Updated 04/15/2022 12:02 PM
Project Title

Water Service Meter Improvements - Equipment

Physical Address View project details and contacts
City, State (County) Selah, WA 98942   (Yakima County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Supply of approximately 2,855 meter interface units, replacement registers, complete positive displacement and ultrasonic meters, meter box lids, and installation accessories over a three-year period. Also included is the supply of required meter collection equipment, hardware and software for a complete advanced metering infrastructure (AMI) system.

Details

Division 11 - Equipment.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents