Similar Projects
Pavement Milling, Hot Mix Asphalt Overlay, Cyclical Pavement Resurfacing, with Drainage and Safety Improvements
Bidding
Blue Hill, Sedgwick, ME

Paving
Bidding
Hancock, ME

Rehabilitate Eagle Lake Carriage Road at Acadia National Park
Post-Bid
$1,000,000 to $5,000,000 est. value
Bar Harbor, ME 04609

Hot Mix Asphalt Overlay with Safety Improvements
Results
ME

On Call Maintenance Paving/Located in Regions 1-5
Results

(LCP) Light Capital Paving
Results
Bar Harbor, Columbia, Ellsworth, Gouldsboro, Hancock, Lamoine, Milbridge, Mount Desert, Orland, Southwest Harbor, Tremont, Trenton, ME 04605

Pavement Milling, Hot Mix Asphalt Overlay with Safety Improvements
Results
Blue Hill, ME 04614

Crack Sealing and Crack Repair
Results
Blue Hill, Dover Foxcroft, Orland, Sebec, ME 04614

On Call Milling Machines and Grinders
Results

2020 Pavement
Results
Bucksport, ME

Gravel Road Construction
Results

Roadwork Spring 2021
Results
Bernard, ME

On Call Milling Machines and Grinders
Results

On Call Maintenance Paving
Results

(LCP) Light Capital Paving
Results
Less than $1,249,000 est. value

Last Updated 03/26/2020 07:02 AM
Project Title

(LCP) Light Capital Paving And Maintenance Lot Paving

Physical Address View project details and contacts
City, State (County) Brooksville, Monroe, Prospect, Searsport, Sedgwick, Stockton Springs, Swanville, Winterport, ME 04986   (Hancock County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Location: In Hancock, and Waldo Counties, project is located: Map ID 1 is in Sedgwick and Brooksville on Route 176 beginning at the westerly intersection with Route 15 and extending northerly to the intersection with Route 175. Includes paving shoulders. Map ID 2 is in Stockton Springs on Cape Jellison Road beginning at the intersection with Main Street and extending southerly to the intersection with Lighthouse Road. Map ID 3 is in Winterport on Route 69 beginning at the intersection with Route 1A and extending northerly to 0.14 miles west of the intersection with Coles Corner Road. Includes paving shoulders. Map ID 4 is in Winterport on Route 139 beginning 1.42 miles west of Goshen Road and extending northerly to the intersection with Route 69. Map ID 5 is in Stockton Springs on Main Street beginning at the westerly junction with Route 1/3 and extending easterly to the junction with Route 1/3. Includes paving shoulders. Map ID 6 is in Searsport and Prospect on Nickels Road beginning at the intersection with Route 1A and extending westerly to the intersection with Mt. Ephraim Road. Map ID 7 is in Sedgwick, Brooksville, and Penobscot on Route 175 beginning at the north junction with Route 15 and extending northerly to the intersection with Route 166. Includes milling and paving Bridges 3297, and 3628. Map ID 8 is in Monroe and Swanville on Route 141 beginning at the intersection with Route 139 and extending southerly to 0.06 miles south of the intersection with Route 131. Includes milling and paving Bridge 3988. Map ID 9 is in Swanville on Frankfort Road beginning at the intersection with Route 141 and extending northerly to 0.10 miles west of the Swanville/Frankfort town line.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents