Last Updated 06/02/2022 12:35 AM
Project Title

2022 Water Main Improvements - Flint Creek Estates

Physical Address View project details and contacts
City, State (County) Hawthorn Woods, IL 60047   (Lake County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project work consists of the installation of 3300 feet of 8" PVC C900 watermain, and auger and jack 40 feet of 20" steel casing. New valve vaults, hydrants, and replacement of existing water services and buffalo boxes. Pavement patching within the Flint Creek Subdivision will be required. Work will also include the restoration of areas disturbed during construction.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents