Similar Projects
On-Call Contract Storm Drainage Infrastructure System Construction for Public Works Stormwater Project
Term Contract
Bidding
GA

North Woods at Lake Avondale
Infrastructure
Bidding
Avondale Estates, GA

Repair of Storm Water Drainage Systems
Post-Bid
Snellville, GA 30078

West Main Street Draingage Improvements
Post-Bid
Statesboro, GA

Claradon Avenue and Benning Drive Culvert Work
Results
Columbus, GA

Smith Street Drainage Improvements
Results
Hagan, GA 30429

Ellenton Storm Drainage and Street Improvements
Infrastructure
Bidding
Ellenton, GA

Beechwood Circle Drainage Replacement
Post-Bid
Lawrenceville, GA 30046

Whitfield Street Drainage Improvements
Results
Smyrna, GA

Retention Pond Maintenance Services
Infrastructure
Bidding
GA

Crossgate Subdivision Drainage Improvements
Post-Bid
Guyton, GA 31312

Knight Road Culvert Replacement
Results
Rutledge, GA 30663

Jesters Creek East Outfall Replacement - Phase 2
Infrastructure
Bidding
Forest Park, Jonesboro, GA 30236

Grayland Hills Drive Drainage
Post-Bid
Lawrenceville, GA 30046

Holly Court Drainage Repairs
Results
Acworth, GA 30101

Reported 12/09/2021 12:00 AM
Project Title

Neese Road Water Tower Drainage Improvements

Physical Address View project details and contacts
City, State (County) Woodstock, GA 30188   (Cherokee County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: Remove existing headwall and tie in 4” & 6” PVC Pipes and Install storm sewer manhole TP 1 GA STD 1011A. Install 150 linear feet of 18” HDPE storm drain. Tie pipe into existing pedestal style inlet in the Evelyn Farms neighborhood. Any concrete or asphalt removed by pipe trench to be capped with 6” of gravel. Cost to be included in lump sum price of project. Any fence or curbing removed or damaged shall be replaced with the same material, and styling. Contractor to grass seed and mulch any disturbed grass areas. Cost included in lump sum price of project.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents