Similar Projects
Elevator Inspection Services
Term Contract
Design
Chicago, IL 60612

RFP - 457(b) and 401(a) Plan Administrator
Term Contract
Bidding
Chicago, IL 60604

RFP - FY24 Landscape Architect Retainer Services
Term Contract
Bidding
Chicago, IL 60604

Fire Alarm Testing and Battery Replacement at Doc
Term Contract
Sub-Bidding
Chicago, IL 60604

Inspect and Maintain Tarp Electrical Control Chambers and Tide Gate Monitoring Systems
Alteration
Post-Bid
$500,000 est. value
Chicago, IL

HUD Nationwide Construction Inspection Services
Term Contract
Post-Bid
Less than $50,000,000 est. value

East Ave: 55th Street to Joliet Road - Intersection Reconstruction, Phase III
Infrastructure
Results
Countryside, IL 60525

Various Phase III Pavement and Bridge Preservation Inspection Projects, Various Routes
Infrastructure
Results

RFP - Utility Needs Assessment for Orland Park
Term Contract
Bidding
Orland Park, IL 60462

2021 Sanitary Sewer Inspection and Rehabilitation
Infrastructure
Post-Bid
Tinley Park, IL

Various Phase II District One Sign and Tower Structure Inspection Projects
Infrastructure
Results
Less than $200,000 est. value

RFP - Comprehensive Master Plan
Term Contract
Bidding
Midlothian, IL 60445

Asbestos Laboratory Testing, Analysis and Environmental Microbiology Laboratory Services
Alteration
Post-Bid
IL

Various Phase II Statewide Sign Structure Inspection Projects, Various Routes
Infrastructure
Results
Less than $300,000 est. value

RFP - Study and Designation of Howard Street Special Service Area (SSA)
Term Contract
Bidding
Evanston, IL 60645

Last Updated 11/30/2022 01:13 PM
Project Title

RFP - Master Stormwater Management Plan

Physical Address View project details and contacts
City, State (County) Northbrook, IL 60062   (Cook County)
Category(s) Professional Services
Sub-Category(s) Inspection Services
Contracting Method Competitive Bids
Project Status Construction start expected June 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Village of Northbrook (Village) is requesting proposals for professional engineering consultant services (Consultant Services), which include, but are not limited to the evaluation, research, preliminary design, and cost estimation that is necessary to prepare a Third Addendum to the Master Stormwater Management Plan (MSMP) dated August 2011. The Village of Northbrook (Village) is requesting proposals for professional engineering consultant services (Consultant Services), which include, but are not limited to the evaluation, research, preliminary design, and cost estimation that is necessary to prepare a Third Addendum to the Master Stormwater Management Plan (MSMP) dated August 2011. The Villages Stormwater Management Commission (Commission) and staff evaluated thirty-four projects and found that eight projects would be considered for further evaluation as part of this Third Addendum. The Villages Commission, staff and the Board of Trustees contributed to an MSMP dated August 2011 in order to reduce flooding impacts for problematic drainage areas within the Village. The MSMP included twenty-two public infrastructure projects. An initial (First) Addendum to the MSMP dated April 2012 was completed, which added another six projects. A Second Addendum to the MSMP dated April 2015 was completed, which added another three projects. It is now recommended by the Commission and staff to complete a Third Addendum to the MSMP, which will evaluate an additional eight neighborhood improvement projects. The Village is seeking a qualified professional engineering firm for the completion of a Third Addendum to the Master Stormwater Management Plan. This project consists of the evaluation, research, preliminary design, and cost estimation of eight identified project locations. All RFP recipients are encouraged to review the original MSMP and its two addendums and to recommend tasks that have been omitted from this RFP. Pertinent exhibits for this project are included in the Appendix. The scope of work to be performed by the Consultant will include but not limited to the tasks/services below unless otherwise designated. (If any additional tasks are added by the Proposer, please note as such by either bolding or italicizing in Proposal): Phase 1 Kick-off meeting with Village staff. Coordination with the Villages GIS Consultant to obtain all available utility and aerial contour mapping data for the Village. It is the intent that no field survey work should be needed. Review and evaluation of past rain fall related flooding information, which includes, but is not limited to the current Flood Insurance Rate Maps (FIRMs). Review and compilation of historic rain fall data to be included in Addendum #3. Review of all pertinent past stormwater studies and reports. Review of photographs, written accounts, etc. of past flooding events in the eight project areas.

Details

Division 00 - Procurement and Contracting Requirements.
Division 01 - General Requirements.
Division 02 - Existing Conditions.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents