Similar Projects
Buie Professional Building
New Construction, Infrastructure - 4,500 SF
Design
$850,000 CJ est. value
Midlothian, TX 76065

Aura Southgate
New Construction, Infrastructure - 405,286 SF
Design
$44,766,107 CJ est. value
Midlothian, TX 76065

Methodist Pump Station Ground Storage Tank, Booster Pump, and Chloramine Boosting System
Renovation, Infrastructure
Bidding
$100,000 CJ est. value
Red Oak, TX 75154

Avenue E Sanitary Sewer Rehabilitation
Infrastructure
Bidding
$2,350,000 CJ est. value
Ennis, TX 75119

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Water Distribution, Sanitary Sewer and Storm Sewer Facilities to Serve Prairie Ridge Phase 4
Infrastructure
Post-Bid
TX

Internal Pipeline Cleaning
Term Contract
Results

Bluff Springs, Phase 1 - Utility Improvements
Infrastructure
Results
Ferris, TX 75125

Crossroads Logistics Park Building 4
New Construction, Infrastructure - 306,925 SF
Construction
$16,114,483 CJ est. value
Midlothian, TX 76065

Crossroads Logistics Park Building 1
New Construction, Infrastructure - 160,775 SF
Construction
$10,114,123 CJ est. value
Midlothian, TX 76065

7 Eleven - Ovilla Road / Glenn Heights
New Construction, Infrastructure - 4,088 SF
Pending Verification
$500,000 CJ est. value
Glenn Heights, TX 75154

Snap Clean Car Wash / Midlothian
New Construction, Infrastructure - 5,084 SF
Pending Verification
$1,500,000 CJ est. value
Midlothian, TX 76065

1215 Crossing Apartments
New Construction, Infrastructure - 229,800 SF
Design
$10,000,000 CJ est. value
Glenn Heights, TX 75154

Water Distribution, Sanitary Sewer and Storm Sewer Facilities to Serve Prairie Ridge Phase 5
Infrastructure
Post-Bid
TX

Ellis Estates - Offsite Water
Infrastructure
Results
TX

Last Updated 11/21/2022 03:34 AM
Project Title

2024 RC Pipe Replacement

Physical Address View project details and contacts
City, State (County) Nash, TX 75165   (Ellis County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Furnish labor, materials, equipment, and incidentals necessary to furnish (PCCP), fittings, and specials, including connections and appurtenances as required for the proper installation and function of the pipe as indicated herein. The pipe shall consist of a welded sheet steel cylinder within a dense concrete core and around which there is placed high tensile strength wire, wound helically under measured tension, with a dense mortar coating covering the core and wire, and with steel joint rings of the bell and spigot type for rubber gasket. Only the embedded steel cylinder type will be allowed for this Project. Prospective offerors must register with the Procurement Website as a plan holder, even if proposal documents are obtained from a plan room or other site. All official notifications, addenda and other documents will be offered only through the Procurement Website. Forms obtained from any source other than the District may be incomplete and bidders risk not receiving necessary addenda, or other required documents causing submittal to be considered non-responsive, and eliminating the submittal from award. The District will not be responsible for the completeness, accuracy, or timeliness of the final proposal documents obtained from other sources. The deadline to ask questions is 10/25/2022 4:30 PM CST. Questions are to be submitted using the Question and Answer process on the Procurement Website. Response to questions posted on the Procurement Website will be posted on the website by the District for the benefit of all bidders. A response will be given for questions submitted by end of day on October 25 2022. A response will be posted for questions submitted by end of day on November 8, 2022.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents