Similar Projects
Lead Reduction Program Continuation
Infrastructure
Bidding
Denver, CO

36-Inch Waterline Replacement
Infrastructure
Bidding
$500,000 est. value
Denver, CO

South Platte Water Quality Modeling
Post-Bid
Denver, CO

East Iliff Avenue and South Quebec Street Meter Vault Replacement
Infrastructure
Post-Bid
Denver, CO 80239

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

East 64th Avenue and Denali Street Infrastructure Project
Results
Denver, CO 80202

Z--Romo/239689, Moraine Park Campground and HQ Utilities-GAOA
Term Contract
Post-Bid
$10,000,000 est. value
Estes Park, CO 80517

East 16th Avenue System, Phase 1
Results
$8,500,000 to $9,400,000 est. value
Denver, CO 80202

Storm/Sewer Ejector Pump Upgrade
Infrastructure
Post-Bid
CO

27th Street Storm Interceptor - Phase 3
Results
$4,700,000 to $5,200,000 est. value
Denver, CO 80014

Water Advanced Metering Infrastructure Fixed Network System Phase II, Year 2022
Infrastructure
Post-Bid
CO

Porteos Phase 8 (Segment 5) (Project)
Results
Denver, CO 80239

Water Meter
Term Contract
Post-Bid
CO

Transport Sub Area 1 Filing 1 Road and Utility Construction Project
Infrastructure
Results
Denver, CO

Storm/Sewer Ejector Pump Upgrade (Materials Only)
Infrastructure, Alteration
Post-Bid
CO

Last Updated 05/11/2022 08:12 AM
Project Title

North Himalaya Road Improvements 56th Avenue to 64th Avenue

Physical Address View project details and contacts
City, State (County) Denver, CO   (Denver County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $110,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Denver, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway. As of May 9, 2022, this project has not yet been awarded. A timeline for award has not yet been established. This Contract provides for the construction of the following: Furnish and install over 150 LF of 8-inch water line with appurtenances, over 2,700 LF of 18-inch to 30-inch storm sewer pipe with appurtenances, and approximately 1 mile of street construction. Bidders must be licensed Contractors in the State of Colorado. Bids will be received providing unit price for items; however, the price given will be on a maximum not-to-exceed amount, as described in the Bidding Documents. The Work is expected to be commenced within thirty (30) days after the Date of Contract. Bid Security in the amount of five percent (5%) of the total Bid Price must accompany each Bid in the form specified in the Instructions to Bidders. The Successful Bidder will be required to furnish a Performance Bond, Labor and Material Payment Bond guaranteeing faithful performance and warranty bond for two-years after Substantial Completion, and the payment of all bills and obligations arising from the performance of the Contract. The OWNER reserves the right to award the contract by sections, to reject any or all Bids, and to waive any informalities and irregularities therein. For further information, please contact Barney Fix at Merrick & Company at 303-751-0741.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents