Hyde Park Restroom - 319615 - City of St.Joseph
New Construction, Infrastructure
Conception
$482,820 CJ est. value
Saint Joseph, MO 64504

Site Development - East Side Terminal Area - 47732185 - City Of Lee Summit
New Construction, Infrastructure
Conception
$2,653,000 CJ est. value
Lees Summit, MO 64064

Electrical and Waterline Installation
Term Contract
Design
$250,000 to $500,000 est. value
Saint Charles, MO 65355

SOFTBALL FIELD ARTIFICIAL PLAYING SURFACE AND FENCING
Infrastructure
Design
$300,000 CJ est. value
Kirksville, MO 63501

McClendon Ditch Sewer Improvements
Infrastructure
Bidding
$6,168,200 CJ est. value
Lees Summit, MO 64081

McClendon Ditch Sewer Improvements
Infrastructure
Bidding
$6,168,200 CJ est. value
Lees Summit, MO 64081

Butterfly Valves and Flanges
Post-Bid
Saint Louis, MO

Preservation Square Phase 2B - Site Prep Package
Infrastructure
Post-Bid
Saint Louis, MO 63106

Sitework Services
Term Contract
Results
Columbia, MO

Water Main Replacement in the area of Jefferson Street to Lydia Avenue, West 99th Terrace to East Red Bridge Road
Infrastructure
Results
Kansas City, MO 64111

Element By Westin - Marriott / Springfield
New Construction, Infrastructure - 71,477 SF
Construction
$22,000,000 CJ est. value
Springfield, MO 65807

Katie's Pizza & Pasta Osteria - Ballpark Village / St. Louis
New Construction, Infrastructure - 10,000 SF
Construction
$3,000,000 CJ est. value
Saint Louis, MO 63102

Reserve at St. Peters
New Construction, Infrastructure
Pending Verification
$53,000,000 CJ est. value
Saint Peters, MO 63376

The Chabad Jewish Center / St Charles County
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Cottleville, MO 63366

South Morley Street Corridor Project - City of Moberly
Infrastructure
Conception
$5,000,000 CJ est. value
Moberly, MO 65270

Last Updated 10/05/2022 05:07 PM
Project Title

Denmark Road Utility Extension

Physical Address View project details and contacts
City, State (County) Union, MO 63084   (Franklin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $154,678 [brand] Estimate
Plans Available from Civil Engineer - 06/20/22
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work includes extension of multiple utilites along Denmark Road crossing Birch Creek and descirbed as follows; installation of approximately 191 lineal feet of 12-inch diameter C900 DR 14 water main, approximately 180 lineal feet of HDPE DR 7 water main installed by directional bore crossing Birch Creek, approximately 204 lineal feet of 6-inch diameter SDR 21, Class 200 PVC sanitary sewer force main, approximately 180 lineal feet of HDPE DR 11 sanitary sewer force main installed by directional bore crossing Birch Creek, and other incidental items and work described in the Project Manual, or reasonably inferable therefrom. A bid security in the amount of five percent (5%) of the bid amount must accompany each bid, in accordance with the Instructions to Bidders. The City of Union anticipates issuing a notice to proceed in September 2022. The owner intends to award the contract to the most responsive, responsible bidder submitting the lowest bid. The owner reserves the right to reject any and all bids, and to waive any irregularities in the best interest of the owner

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents