Similar Projects
Kemco Industries Industrial Warehouse
New Construction - 100,050 SF
Conception
Sanford, FL 32773

Springs Enclosed Self-Storage
New Construction - 78,000 SF
Conception
Longwood, FL

Fastenal Warehouse and Office
New Construction - 142,200 SF
Design
Sanford, FL 32773

Smart Charging Technologies Office-Storage Building
New Construction - 14,349 SF
Design
$1,100,000 est. value
Oviedo, FL 32765

Debary Tower Foundation Modification
Infrastructure
Bidding
$375,000 CJ est. value
Sanford, FL 32771

Georgetown Storm Sewer Upgrades
Infrastructure
Bidding
$400,000 CJ est. value
Sanford, FL 32771

Charisma Media Office Building
New Construction, Infrastructure - 20,775 SF
Sub-Bidding
$1,500,000 CJ est. value
Sanford, FL 32771

Seminole County Fire Station No. 39
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Sanford, FL 32771

WMG Sanford Commercial - Sitework
Infrastructure
Post-Bid
Sanford, FL 32771

Federal Inspection Station Renovation
Renovation, Demolition - 60,000 SF
Results
Sanford, FL

SR 46 Water Main Replacement
Infrastructure
Results
$4,113,089 CJ est. value
Sanford, FL 32771

The Father's Table - Cold Storage Addition
Addition - 11,200 SF
Construction
$3,219,000 est. value
Sanford, FL 32771

Oviedo Commercial Center - Building 5
New Construction - 50,798 SF
Construction
$3,525,382 est. value
Oviedo, FL 32765

El Dorado Furniture / Altamonte Springs
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Altamonte Springs, FL 32701

Oviedo Mall Redevelopment
Demolition, New Construction, Infrastructure - 128,850 SF
Pending Verification
$150,000,000 CJ est. value
Oviedo, FL 32765

Last Updated 09/12/2022 03:38 PM
Project Title

RFQ D/B - Maintenance Building (Project) at Orlando Sanford International Airport

Physical Address View project details and contacts
City, State (County) Sanford, FL 32773   (Seminole County)
Category(s) Commercial, Heavy and Highway, Transportation
Sub-Category(s) Airline/Passenger Terminal, Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected December 2022 , Request For Proposals, Construction documents
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Sanford Airport Authority (Owner) requires a Design-Build Team (Respondent) to provide design and construction services for a new Maintenance Building on Owner property in Sanford, Florida in accordance with 287.055(9), Florida Statutes. When complete, the new building will be used for the daily operations of the Owner Maintenance Department. The objective of the RFQ is to identify and seek competitive qualifications from Respondents to provide services to design, permit and construct the new building in accordance with the design criteria package. The project can be generally described as: Design and construction of a 12,500 square feet of pre-engineered metal building and associated site improvements on an existing parcel of land at the Orlando Sanford International Airport. Work includes new building for office space, storage, and mechanics bay. Site improvements include parking, drive aisles, fence/walls, and landscaping. Renovation of the existing 6,000 square feet maintenance shed is included. The time of completion for the Maintenance Building - Design-Build project is anticipated to be 365 calendar days to achieve Substantial Completion. Clarification/Question Deadline August 9, 2022 @ 5 :00 p.m. Addenda Posted (Final) August 12, 2022 Clarification/Question Deadline September 23, 2022 Addenda Posted (Final) September 27, 2022 1st Evaluation Meeting October 17, 2022 @ 3:00 p.m. 2nd Evaluation Meeting (if needed) October 18, 2022 @ 3:00 p.m. Ranking Posted October 17 or 18, 2022 Ranking & Approval to Negotiate with Top Ranked Firm to BOD November 1, 2022 Contract Negotiation/Development November 2, 2022 through November 18, 2022 Recommendation to Award & Contract to BOD for approval December 6, 2022 The time of completion for the Maintenance Building – Design-Build project is anticipated to be 365 calendar days to achieve Substantial Completion

Details

12,500 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Door Hardware, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Parking Control Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents