Similar Projects
Utilities - US 77
Infrastructure
Conception
$1,000,000 est. value
Noble, OK 73068

Bike Lanes: Along the N. Villa AveNue., N. Youngs Boulevar., and N. Venice Blvd. alignments between NW 62nd St. and NW 10th St.
Infrastructure
Conception
$922,000 est. value
Oklahoma City, OK

Resurface - US 62
Infrastructure
Design
$6,700,000 CJ est. value
Cache, OK 73527

I-40 - Utilities
Infrastructure
Design
$840,000 CJ est. value
Custer City, OK 73639

State Highway 72 Lift Station Storm Water Drainage Rehabilitation
Infrastructure
Bidding
$300,000 CJ est. value
Coweta, OK 74429

State Highway 72 Lift Station Storm Water Drainage Rehabilitation
Infrastructure
Bidding
$300,000 CJ est. value
Coweta, OK 74429

Miami Public Schools Physical Education Facility Addition
Addition, Infrastructure - 5,321 SF
Sub-Bidding
$2,000,000 CJ est. value
Miami, OK 74354

Bishop Public School - New Middle School
New Construction, Infrastructure - 20,043 SF
Sub-Bidding
$4,500,000 CJ est. value
Lawton, OK 73505

W912bv21r0047-Presolicitation Notice (Sources Sought)- Bureau of Reclamation Waterline Relocation, Tinker AFB
Term Contract
Post-Bid
$5,000,000 to $10,000,000 est. value
Oklahoma City, OK 73145

Site Preparation Services
Term Contract
Post-Bid
Claremore, OK 74017

Water Line Replacement
Results
McAlester, OK 74501

1000-1600 Block East Pine Avenue Waterline Relocation
Results
Enid, OK 73701

7-Eleven Store 42235 / Oklahoma City
Demolition, New Construction, Infrastructure - 4,788 SF
Construction
$2,500,000 CJ est. value
Oklahoma City, OK 73139

Storage Tank Rehabilitation
Infrastructure
Construction
$487,500 CJ est. value
Medford, OK 73759

WeConnect Office Expansion
Demolition, Renovation, Infrastructure - 866 SF
Pending Verification
$40,000 CJ est. value
Tulsa, OK 74137

Last Updated 09/21/2022 12:03 AM
Project Title

Sanitary Sewer Improvements Collection System and Force Main

Physical Address View project details and contacts
City, State (County) Goldsby, OK 73093   (McClain County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,370,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Sanitary Sewer Improvements Collection System & Force Main EDA Award No. 08-01-05606 Project to include constructing approximately 4,000 l.f. of 8" gravity sewer, 13 manholes, one (1) duplex submersible lift station, 11,500 l.f. of 6" PVC Force Main, 3,500 l.f. of 6" Irrigation Force Main, one (1) traveling volume gun sprinkler, and appurtenances. The Notice to Bidders, Form of Bid, Form of Contract, Plans and Specifications, Forms of Bid Bond, Performance and Statutory Payment Bond, and other Contract Documents may be examined at the following: Each bidder shall accompany his original bid, with a certified or Cashiers Check on a solvent bank located in Oklahoma or a Bidders Bond, in the amount of five (5) percent of the amount bid, as a guarantee of his ability to perform the contract bid upon, and that he will enter into a written contract with the Owner to perform said work and/or furnish said materials in accordance with said plans and specifications and furnish the required bonds within seven (7) days after the acceptance of his bid. The deposit will be retained by the Owner as, and for, liquidated damages in case the successful bidder fails to enter in said contract and furnish the required bonds provided for in the specifications within the time required. Deposit of the unsuccessful bidders will be returned upon the execution of the Contract and required bonds. Each bidder shall accompany his bid with a sworn statement in writing that the Bidder has not directly or indirectly entered into an agreement, express of implied, with any other bidder or the price or amount of such bid or any bids, the limiting of the bids or bidders, the paying to anyone any money for promotion expenses, the parceling or farming out to any bidder or bidders or other persons of any part of the contract or any part of the subject matter of the bid or of the profits thereof. A Performance, Maintenance and Statutory Bond in the amount of 100% of the contract price with a Corporate Surety licensed in Oklahoma and approved by the Owner and Engineer, will be required for the faithful performance of the contract, and the bidder shall state in the proposal the name and address of the Surety or Sureties who will sign this bond in case the contract is awarded to him. The Maintenance Bond required will guarantee the repair of all damage due to improper materials or workmanship for a period of one (1) year after the acceptance of the work by the Owner. All bids shall remain on file at least forty-eight (48) hours. Bids received more than ninety-six (96) hours prior to the Bid Opening will be returned. Contract to be awarded to low responsive responsible bidder. Conditional bids shall not be accepted. The Owner reserves the right to waive any informalities in the bidding and the right to reject any and all bids in accordance with the Oklahoma Competitive Bidding Act.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents