Similar Projects
Ewert Park Improvement - City of Joplin
Renovation, Infrastructure
Conception
$5,829,375 CJ est. value
Joplin, MO 64801

Existing Traffic Signal Upgrades - 4th & Murphy Signal Project - TC0516 - City of Joplins
Infrastructure
Design
$1,000,000 CJ est. value
Joplin, MO 64801

$PRESS - 32nd Street Place - Ross Construction Group LLC
New Construction, Infrastructure
Design
$188,000,000 CJ est. value
Joplin, MO 64801

Microsurfacing 2023
Infrastructure
Bidding
$430,000 CJ est. value
Joplin, MO 64801

Whataburger - S Rangeline Rd / Joplin
New Construction, Infrastructure - 3,305 SF
Bidding
$1,000,000 CJ est. value
Joplin, MO 64804

Lowe's XDT / Joplin
New Construction, Infrastructure - 63,000 SF
Post-Bid
$6,800,000 CJ est. value
Joplin, MO 64801

Expansion to the Existing Parking Lot
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Carthage, MO 64836

Carl Junction Rte. Z/Pennell St. Sidewalk Improvements, Phase V
Infrastructure
Results
$481,972 CJ est. value
Carl Junction, MO 64834

Oak Road Over Deer Creek
Demolition, Infrastructure
Results
$715,927 CJ est. value
Carthage, MO 64836

Performing Arts Center - Carthage R-9 School District
Demolition, New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Carthage, MO 64836

32nd Street Place Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$34,500,000 CJ est. value
Joplin, MO 64804

O'Reilly Auto Parts (J4) #118 / Joplin
Addition, Infrastructure - 8,550 SF
Post-Bid
$300,000 CJ est. value
Joplin, MO 64801

SWPA - SUB 169kv Rebuild
Infrastructure
Results
$2,396,826 CJ est. value
Carthage, MO 64836

WestRock - Addition / Joplin
Addition, Demolition, Infrastructure
Pending Verification
$11,000,000 CJ est. value
Joplin, MO 64804

RFQ Design - Transit Transfer Station Site Selection and Design Services
New Construction, Infrastructure
Post-Bid
$15,000,000 CJ est. value
Joplin, MO 64801

Last Updated 03/27/2023 12:39 PM
Project Title

Mid-Missouri Bank / Webb City

Physical Address View project details and contacts
City, State (County) Webb City, MO 64870   (Jasper County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Bank, Site Development
Contracting Method Bids by Invitation
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of a new one story building.

Details

1 Story Above Grade, 4,926 SF.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation.
Division 08 - Openings, Metal Doors and Frames, Special Function Doors, Entrances and Storefronts, Special Function Hardware, Special Function Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Partitions, Emergency Access and Information Cabinets, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Security Mirrors and Domes.
Division 11 - Equipment, Security, Detention, and Banking Equipment, Vault Equipment, Safe Deposit Boxes, Safes, Vault Ventilators, Teller and Service Equipment.
Division 12 - Furnishings, Art, Window Treatments, Specialty Casework, Bank Casework, Furniture, Office Furniture.
Division 13 - Special Construction, Vaults, Security Vaults.
Division 14 - Conveying Equipment, Pneumatic Tube Systems.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs, Gutters, Sidewalks, and Driveways, Curbs and Gutters, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents