Similar Projects
Cross Island Parkway (US 278) Toll Conversion Design-Build Project
Bidding
SC

Agerton Neighborhood Revitalization Phase 1
Infrastructure
Bidding
Cheraw, SC

State Street Resurfacing FY 19/20
Post-Bid
Sumter, SC 29151

Transportation Improvements
Post-Bid
Anderson, SC 29625

Preservation - Orangeburg County
Results
SC

Calhoun County CTC Road Improvement Project
Results
Less than $223,019 est. value
Fort Motte, SC 29135

Building 320 Modifications, Apron and Taxilane
Infrastructure, Alteration
Bidding
Myrtle Beach, SC 29577

Improvement to City of Clinton Roads 2021
Post-Bid
Less than $185,000 est. value
Clinton, SC

Marion County Inaccessible Roads
Results
Less than $125,202 est. value
Marion, SC

Greenville Legislative Delegation Transportation Committee MMRP FY 21/22 - 588.02
Infrastructure
Bidding
$7,500,000 to $9,000,000 est. value
Fountain Inn, SC

Asphalt Paving at Wade Hampton High School
Post-Bid
Hampton, SC 29924

Marion County Roads Damaged by Flooding
Results
Less than $1,380,368 est. value
Marion, SC 29571

New IT Building and Adult Education Building
Infrastructure, Alteration
Bidding
Dillon, SC 29536

County Line Trail Roadway Improvements
Post-Bid
$500,000 to $749,999 est. value
Columbia, SC

2020 Onyx Mastic Surface Treatment Plan TST
Results
North Charleston, SC 29405

Reported 10/12/2021 11:28 PM
Project Title

Interstate Preservation - I-95

Physical Address View project details and contacts
City, State (County) SC   (Orangeburg County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding on Hold
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Law Enforcement Officer 500.000 Hr Liquid Asphalt Binder Pg76-22 3,971.168 Ton Milling Existing Asphalt Pavement 2.0" 24,323.199 Sy Milling Existing Asphalt Pavement 3.0" 616,187.688 Sy Milled-In Rumble Strip 55.280 Mi Stone Matrix Asphalt Surface Course - 9.5 Mm 64,051.090 Ton Permanent Construction Signs (Ground Mounted) 932.000 Sf Construction Zone Electric Changeable Message Sign (Trailer 2.000 Ea 6" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 148,000.000 Lf 6" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 292,000.000 Lf 12" White Solid Lines - Fast Dry Paint 36,400.000 Lf 6"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 292,000.000 Lf 6" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 74,000.000 Lf 6" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 146,000.000 Lf 12" White Solid Lines - Thermo. - 125 Mil. 18,200.000 Lf 6" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 146,000.000 Lf Perm.Red/Clear Pavement Markers Bi-Dir. - 4"x 4" 1,900.000 Ea

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents