Similar Projects
Jeff Valley South Stewardship IRSC
Term Contract
Design
Palomar Mountain, CA 92060

S205--Solid Waste Disposal Service
Term Contract
Post-Bid
Fresno, CA

The Haskell Stewardship Integrated Resource Timber Contract (IRTC)
Infrastructure
Post-Bid
Quincy, CA

District-Wide Portable Restroom Facilities and Services
Term Contract, Alteration
Results
Bakersfield, CA 93314

Site Demolition
Infrastructure, Alteration
Results
Cudahy, CA 90201

Trash Collection, Hauling, and Disposal Services
Term Contract, Infrastructure
Post-Bid
Kyburz, CA

Countywide Solid Waste Hauling,Recycling And Disposal
Infrastructure
Results
CA

Trash Collection, Hauling and Disposal Services in Mendocino County
Infrastructure
Post-Bid
Ukiah, CA

Unitized Group Rations (Ugrs) Food Waste Disposal Service At Dla Distribution San Joaquin, Ca
Term Contract
Results
Tracy, CA 95304

S205--Bridge - Solid Waste Collection Disposal
Term Contract
Post-Bid
Rancho Cordova, Sacramento, CA 95655

Unsheltered Resident Encampment Site Waste Removal and Cleanup Services
Infrastructure
Results

Unsheltered Resident Encampment Site Waste Removal and Cleanup
Term Contract, Infrastructure
Post-Bid

Cardboard Recycling Services
Term Contract
Results
Tracy, CA

Trash Collection, Hauling, and Disposal Services
Term Contract, Infrastructure
Post-Bid
CA

Road Materials and Hauling Services
Infrastructure
Results
Fairfield, CA

Last Updated 05/03/2022 09:02 AM
Project Title

Waste Removal and Roll-Off Bin Rental

Physical Address View project details and contacts
City, State (County) Herlong, CA 96113   (Lassen County)
Category(s) Heavy and Highway
Sub-Category(s) Hauling
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall provide to Sierra Army Depot (SIAD) on an as needed basis (30) cubic yard roll off bins to remove landfill and undesirable materials in accordance with all local, state and federal laws/regulations (to include bin delivery, bin pick up, transportation, and tipping fee if applicable) as necessary to support SIAD. The quantity and delivery of bins could vary; however, there are currently 10 bins on site and 2 to 6 bins are delivered and removed in a typical week.

Details

Division 41 - Material Processing and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents