Similar Projects
Idyllwide Elementary School Remodel
Conception
$1,358,467 est. value
Sanford, FL 32771

Center For Jewish Life
New Construction
Conception
Miami, FL 33129

Site 73-T-W-7 School Replacement
New Construction - 150,289 SF
Design
$38,800,000 est. value
Ocoee, FL 34761

Pre-K Addition at G. Weaver Hipps Elementary School
Addition
Design
$4,500,000 to $6,000,000 est. value
Lehigh Acres, FL 33936

WAN/Internet Access
Renovation
Bidding
$10,000 CJ est. value
Defuniak Springs, FL 32433

K-8 School CC Sunbridge K-8 in the Weslyn Subdivision of the Sunbridge Communities New Construction Project
New Construction, Renovation, Infrastructure
Bidding
$2,000,000 CJ est. value
Orlando, FL 32801

Deerfield Beach Elementary School - Smart Program Renovations
Post-Bid
$3,777,000 est. value
Deerfield Beach, FL 33441

Facilities Renovation and Repair Repair Hammock Pointe Elementary School - JC Mitchell Elementary School
Renovation
Post-Bid
Less than $10,360,037 est. value
Boca Raton, FL 33433

Construction Management Services for New Baker County K-5 School
Results
FL

Hollywood Hills ES - SMART Program Renovations
Renovation, Infrastructure
Results
$5,750,000 CJ est. value
Hollywood, FL 33021

The Pine School
Addition - 22,369 SF
Construction
$6,800,000 est. value
Hobe Sound, FL 33455

Alazhar School
Addition - 19,785 SF
Construction
$1,711,950 est. value
Tamarac, FL 33068

Unity Clearwater Church And Discovery Academy Of Science
Addition - 88,704 SF
Pending Verification
Clearwater, FL 33764

K-8 "FF" Minneola Area Capacity Construction
Addition
Pending Verification
$38,500,000 est. value
Minneola, FL

Littlewood Elementary School New Classroom Building
New Construction, Demolition
Conception
$16,827,975 est. value
Gainesville, FL 32605

Last Updated 09/16/2022 03:07 PM
Project Title

Chester W. Taylor Elementary School Renovation - Pasco County Schools

Physical Address View project details and contacts
City, State (County) Zephyrhills, FL 33543   (Pasco County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Construction start expected June 2025
Bids Due View project details and contacts
Estimated Value $346,270 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A more detailed scope is expected to be released on a future date. As of September 16, 2022 this project is conceptual. A bond is expected to go for ballot for project funding in November of 2022. Information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents