Similar Projects
Chambers Creek Watershed Floodwater Retarding Structure Site 1 Upgrade and Repair
Infrastructure
Bidding
$6,000,000 to $10,000,000 est. value
TX

Storm Water Mitigation Pond for Wastewater Treatment Plant
Infrastructure
Bidding
Katy, TX

Corrugated Culverts
Post-Bid
Bellville, TX 77418

Saddlecreek Phase 13 - Water, Wastewater, and Drainage Improvements
Post-Bid
Georgetown, TX 78626

Port Road Expansion and Drainage at Bayport Container Terminal
Results
Less than $18,894,468 est. value
Seabrook, TX 77586

Barker Watershed Sediment Removal Program (Package 1)
Results
Less than $5,089,579 est. value
Houston, TX 77092

Pond Maintenance Group 1
Post-Bid
$40,000 est. value
Plano, TX 75025

Cypress Point Lake Estates Detention Pond Rehabilitation
Results
Cypress, TX 77429

Placement Area 24 Levee Construction Project
Post-Bid
Port Arthur, TX 77642

Rush Creek at Indian Trail Erosion Improvements
Results
$2,000,000 est. value
Arlington, TX 76010

Wafer Street Paving and Drainage Improvements Phase II Project
Post-Bid
Pasadena, TX

Erosion Control and Storm Drainage Improvements Part I
Results
Dallas, TX 75201

Austin Avenue Paving and Drainage Improvements
Post-Bid
Pasadena, TX 77502

Construction of the Southern Trails Ponds Rehabilitation
Results
Houston, TX

Easthaven Drive Paving and Drainage Improvements
Post-Bid
Pasadena, TX 77501

Reported 12/15/2021 12:00 AM
Project Title

Chambers Creek Watershed Floodwater Retarding Structure Site 15 Upgrade and Repair

Physical Address View project details and contacts
City, State (County) Waxahachie, TX   (Ellis County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $3,000,000 to $6,000,000
Plans Available from Municipal Agency - 10/25/21
Owner View project details and contacts
Architect View project details and contacts
Description

Major items of work are: 21 AC Clearing and Grubbing; 8,550 LF Sediment Fence; 20 AC Vegetation Establishment; 39,400 CY Excavation; 100 CY Rock Excavation; 2,907 CY Earthfill; 3,000 CY Fine Drain fill; 20 CY Coarse Drainfill; 25,100 SY Embankment Topsoil; 91,800 SY Topsoil; 26,300 CY Lime Treated Earthfill; 1,243 tons Furnishing and Handling Lime; 50 CY Class 4500 Concrete; 20 CY Class 3000 Concrete; 300 LF Reinforced Concrete Pressure Pipe; 440 LF Perforated Plastic Pipe; 300 LF Solid Plastic Pipe; 60 LF 6” Ductile Iron Pipe; 220 LF Boring and Jacking; 300 tons Rock Riprap, R-150; 1,400 tons Rock Riprap; R-300; 300 tons Rock Riprap, Bedding; 220 LF Conduit Slip Lining; 5,700 LF Field Fence; 1,900 SY Geotextile and 1 Job/Lump Sum: Structure Removal; Pollution Control; Irrigation System; Construction Surveys; Mobilization and Demobilization; Removal of Water; Water Control Gate; Metal Work; Identification Plaques or Markers; Contractor Quality Control; Field Office; Conduit Abandonment. [AC: Acres; LF: Linear Feet; CY: Cubic Yards; SY: Square Yards]. Bid Opening Information : Microsoft Teams meeting Join on your computer or mobile app Click here to join the meeting Or call in (audio only) +1 347-966-8462,,571154758#   United States, New York City Phone Conference ID: 571 154 758#

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents