Similar Projects
Bally's Casino / Chicago
LEED Certification, New Construction, Infrastructure
Design
$1,700,000,000 CJ est. value
Chicago, IL 60654

Water Main Replacement
Design
Elmwood Park, IL

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Burley ES - LBP Mitigation and ACM Patch & Repair in the Ventilation System
Term Contract, Infrastructure
Results
$29,725 CJ est. value
Chicago, IL 60657

Utilities at Birch Park
Renovation
Results
Hoffman Estates, IL 60169

St. Alexius Medical Center Addition
Addition, Infrastructure, Renovation - 29,000 SF
Construction
$14,000,000 CJ est. value
Hoffman Estates, IL 60169

210 N Aberdeen Mixed-Use
New Construction, Infrastructure - 10,700 SF
Construction
$140,000,000 CJ est. value
Chicago, IL 60607

State Street Mixed-Use Tower / Near North Side
Demolition, New Construction, Infrastructure - 10,000 SF
Pending Verification
$50,000,000 CJ est. value
Chicago, IL 60610

Dialysis Care Center Western
New Construction, Infrastructure
Pending Verification
$600,000 CJ est. value
Chicago, IL 60620

1810-20 N Wells Redevelopment
Addition, Demolition, Renovation, Infrastructure - 4,000 SF
Design
$7,000,000 CJ est. value
Chicago, IL 60614

Far South Parking Lot Improvements
Renovation
Post-Bid
IL

Site Reconstruction
Results
Streamwood, IL 60107

Petnet - Sitework
Alteration
Construction
Elk Grove Village, IL 60007

North Rush Street Mixed-Use Development
New Construction, Infrastructure
Pending Verification
$1,900,000 CJ est. value
Chicago, IL 60611

Last Updated 10/12/2022 12:07 AM
Project Title

Eagle Way Sewer Replacement Project

Physical Address View project details and contacts
City, State (County) Hoffman Estates, IL 60169   (Cook County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $2,379,250 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

For work to be constructed under the provisions of the Standard Specifications for Road and Bridge Construction published by the Illinois Department of Transportation, current edition. The Village of Hoffman Estates is accepting sealed bids for the proposed work officially known as the Eagle Way Sewer Replacement Project, and is located along Eagle Way between Lakewood Boulevard and Central Road, and along Central Road between Eagle Way and Center Drive in Hoffman Estates, Illinois. All bids will be publicly opened and immediately read thereafter. The proposed improvements include, but are not limited to, 4,017 LF of sanitary sewer 12", precast manholes installation, trench backfill and asphalt street patching, PCC drive apron and sidewalk removal and installation, erosion control and restoration of the site and other work necessary to complete the project as shown on the plans and as described herein. Plans and proposal forms are available for download from the Village of Hoffman Estates website. beginning Wednesday, April 20, 2022. All proposals must be accompanied by a proposal guaranty as provided in BLRS Special Provision for Bidding Requirements and Conditions for Contract Proposals contained in the "Local Roads and Streets Recurring Special Provisions". The Village of Hoffman Estates strongly encourages minority firms and women's business enterprises to apply. If subcontracts are to be let, the primary contractor shall take these same affirmative steps to solicit bids from minority and women's firms. The Village of Hoffman Estates reserves the right to reject any or all proposals and waive any informality in bidding and to accept the proposal deemed most advantageous to it, all in BLRS Special Provision for Bidding Requirements and Conditions for Contract Proposals contained in the "Local Roads and Streets Recurring Special Provisions". Emergency vehicle access must be maintained at all times. Failure to comply will result in liquidated damages in the amount of $1,425 per calendar day.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents