Similar Projects
Chartiers Park Stream Restoration
Infrastructure
Bidding
Bridgeville, PA

Clinton Avenue Extension Stream Bank Stabilization
Infrastructure
Bidding
$45,000 est. value
Oakdale, PA 15071

Corrugated Metal Pipe
Post-Bid
Pittsburgh, PA 15123

Semicir Street Landslide Remediation
Post-Bid
Pittsburgh, PA 15214

Carrie Furnace Redevelopment Project - Western Phase
Results
$1,300,000 to $1,500,000 est. value
Monroeville, PA 15146

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Plum Creek Stream Bank Stabilization
Infrastructure
Bidding
$77,500 est. value
Pittsburgh, PA

Reinforced Concrete Products
Post-Bid
Monroeville, PA

Waterworks Park Reservoir Liner and Cover Replacement
Results
$200,000 est. value
Sewickley, PA 15143

Cowley Park Landslide Remediation
Post-Bid
Pittsburgh, PA 15219

Municipal Building Stormwater Pond
Results
Presto, PA 15142

Bairdford Park Master Plan Construction B-1 Ballfield Project
Post-Bid
$85,000 est. value
Cheswick, PA 15024

Bridge Demand MTC 12, 20
Results
$1,000,000 to $2,499,999 est. value

Combined Sewer Overflow Debris Control
Post-Bid
$30,000 est. value
Etna, PA 15223

Ramblewood Curb & Gutter Replacement Project
Results
Pittsburgh, PA 15237

Reported 07/07/2021 12:00 AM
Project Title

Department of Public Works - Robb Hollow Parklet Phase 2

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA   (Allegheny County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer - 06/17/21
Owner View project details and contacts
Architect View project details and contacts
Description

This project involves the construction of a pocket park; including but not limited to the installation of an aggregate pedestrian path; installation of a retaining wall; tree and shrub planting; site preparation and grading; erosion and sedimentation controls; site protection; resident notification; site restoration; and traffic control, complete in place.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents