Similar Projects
HVAC Maintenance and Services
Term Contract, Alteration
Bidding
Hanahan, SC

Basic Science Building Air Handler 1 (West Side) Replacement
Alteration
Bidding
$4,300,000 to $4,400,000 est. value
SC 29425

Basic Science Building AHU-4 and AHU-4A Replacement
Post-Bid
$1,200,000 to $1,300,000 est. value
Charleston, SC 250420

Psych Institute Chiller 1 Replacement
Post-Bid
$1,000,000 to $2,000,000 est. value
Charleston, SC 29425

Replacement High Pressure Breathing Air Compressor System
Results
Less than $60,000 est. value
Hollywood, SC 29449

J045--534-20-2-5088-0014, Chiller Maintenance and Repairs, Base +4
Results
Charleston, SC 29401

Coastal Center - Hillside 320 and 420 HVAC Replacement
Post-Bid
$450,000 to $550,000 est. value
Summerville, SC 29485

Annual and Semi-Annual HVAC Chiller Maintenance Service
Results
Charleston, SC 29412

Repair HVAC Dormitory Building 2405 and 2406
Post-Bid
$1,000,000 to $5,000,000 est. value
Charleston, SC 29404

Roof and Mechanical Unit Replacement
Results
Folly Beach, SC 29439

Refrigerents (Various)
Post-Bid
Moncks Corner, SC 29461

Hoods and Ducts Cleaning, Maintenance, and Repair
Results
Charleston, SC 29404

Chiller Service and Repair
Post-Bid
Charleston, SC 29414

Provide and Install an HVAC Chiller Compressor in Building. 910
Results
Less than $18,840 est. value
Charleston, SC 29423

Welding Fume and Dust Extraction System
Post-Bid
SC

Reported 08/02/2021 12:00 AM
Project Title

Heat Pump System 7.5 ton Charleston SC

Physical Address View project details and contacts
City, State (County) Charleston, SC 29412 (Berkeley, Charleston Counties)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Dismantling and replacement of the existing 7.5 ton Split Heat Pump System. Perform complete start up and operation of the newly installed system. Provide the Government with a complete copy of verification documentation for systems operation and performance. Ensure that all rewiring meet current Federal and State regulations and codes. Host a post-installation inspection of the complete 7.5 ton Split Heat Pump System project with the Operations Director and Contracting Officers Representative. Properly dispose of all removed parts and material per Federal, State, and local regulations and codes. Remove defective heat pump system, Outside unit model: Carrier 38AQ-007—520 and the Air handler model: Carrier 40RMQ008–B611HC Above 10 foot drop in ceiling Replace the copper line set with a new copper line set which is about 25 feet long. The electrical system is a 208 – 230volt and is a three phase system. Install new split 7.5 ton split Heat pump System along with piping and electrical wiring. Replace filter grill with correct size. To provide pressure test, pull vacuum, and charge the new system with refrigerant. To provide labor and materials to provide a complete installation and testing of the new 7.5 ton split heat pump system.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Decentralized Unitary HVAC Equipment, Air-Source Unitary Heat Pumps, Convection Heating and Cooling Units, Water-to-Water Heat Pumps.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents