Project Title | 2021 Road Improvement Project |
Physical Address | View project details and contacts |
City, State (County) | New Concord, OH (Muskingum County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $52,050 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Contractor shall furnish all materials, equipment and tools necessary to complete the asphalt paving complete in place on roadway acceptable to the Operations Manager. 1) 208 W. Main (S. side) – 14' x 43' patch a. ODOT Item 245 – 4” planing of existing asphalt b. 2.5” layer of ODOT Item 448, Type 2 PG 64-22 asphalt intermediate course c. 1.5” layer of ODOT Item 448, Type 1 PG 64-22 asphalt surface course d. ODOT Item 407 tack coat, trackless tack, applied at .05 gallons per square yard between asphalt layers e. Install 4” wide AC band at all perimeter joints. 2) 150 Fairfield Dr – 8' x 14' patch a. ODOT Item 245 – 4” planing of existing asphalt b. 2.5” layer of ODOT Item 448, Type 2 PG 64-22 asphalt intermediate course. c. 1.5” layer of ODOT Item 448, Type 1 PG 64-22 asphalt surface course d. ODOT Item 407 tack coat, trackless tack, applied at .05 gallons per square yard between asphalt layers e. Install 4” wide AC band at all perimeter joints 3) Montgomery Blvd – Rt. 83 to Comin St – 2 options Scratch coat specified depressions along route with ODOT Item 448, Type 2 asphalt intermediate course. Contact Operations Manager Matt Wood at 740-255-6246 for locations. See Alternate #1 at end of document. 4) Evergreen Village maintenance building near Liberty Rd – 30' asphalt curb 6” W x 4” H Install curb using ODOT Item 448, 1.5” Type 1 PG 64-22 asphalt surface course unless otherwise approved by Operations Manager Matt Wood. 5) 245 Fernridge Cir – 32' asphalt curb across driveway 6” W x 4” H Install curb using ODOT Item 448, 1.5” Type 1 PG 64-22 asphalt surface course unless otherwise approved by Operations Manager Matt Wood. 6) 265 Fernridge Cir – 27' asphalt curb across driveway 6” W x 4” H Install curb using ODOT Item 448, 1.5” Type 1 PG 64-22 asphalt surface course unless otherwise approved by Operations Manager Matt Wood. 7) 162 Hawthorn Dr – 31' asphalt curb across driveway 6” W x 4” H Install curb using ODOT Item 448, 1.5” Type 1 PG 64-22 asphalt surface course unless otherwise approved by Operations Manager Matt Wood. 8) Hawthorn Drive – 126’ x 25’ (146-155 Hawthorn Dr) a. ODOT Item 245 – 1.5” planing of existing asphalt b. ODOT Item 407 tack coat, trackless tack, applied at 0.15 gallons per square yard. c. 1.5” layer of ODOT Item 448, Type 1 PG 64-22 asphalt surface course d. Install 4” wide AC band as required 9) Mulberry Lane – 40’ x 24’ (near 153 Mulberry Lane) a. ODOT Item 245 – 2” planing of existing asphalt b. ODOT Item 407 tack coat, trackless tack, applied at 0.15 gallons per square yard c. 2” layer of ODOT Item 448, Type 1 PG 64-22 asphalt surface course d. Install 4” wide AC band as required 10) Mulberry Lane – 165’ x 24’ (167 Mulberry Lane at Hawthorn Drive) a. ODOT Item 245 – 2” planing of existing asphalt b. Additional planing at intersection of Mulberry Lane and Hawthorn Drive to remove large asphalt “bump.” See Operations Manager Matt Wood for planing depth. c. ODOT Item 407 tack coat, trackless tack, applied at 0.15 gallons per square yard d. 2” layer of ODOT Item 448, Type 1 PG 64-22 asphalt surface course e. Install 4” wide AC band as required 11) Cherry Lane – 473’ x 13’ (east end of roadway) a. ODOT Item 245 – 2” planing of existing asphalt. b. ODOT Item 407 tack coat, trackless tack, applied at 0.15 gallons per sq yard. c. 1.5” layer of ODOT Item 448, Type 1 PG 64-22 asphalt surface coursed. Install 4” wide AC band as required. Install a 2” asphalt curb at far east driveway for water run-off control. See Operations Manager Matt Wood for location and size. 12) Cherry Lane – 259’ x 16’ (College Drive westbound to Spragg Alley) a. ODOT Item 245 – 2” planing of existing asphalt. b. ODOT Item 407 tack coat, trackless tack, applied at 0.15 gallons per square yard. c. 2” layer of ODOT Item 448, Type 1 PG 64-22 asphalt surface course d. Install 4” wide AC band as required 13) Findley Alley – 224’ x 11’ (Main Street to Cherry Lane) a. ODOT Item 245 – 2” planing of existing asphalt b. ODOT Item 407 tack coat, trackless tack, applied at 0.15 gallons per square yard c. 1.5” layer of ODOT Item 448, Type 1 PG 64-22 asphalt surface course d. Install 4” wide AC band as required 14) South Street – 379’ x 21’ a. ODOT Item 245 – 2” planing of existing asphalt b. ODOT Item 407 tack coat, trackless tack, applied at 0.15 gallons per square yard c. 2” layer of ODOT Item 448, Type 1 PG 64-22 asphalt surface course d. Install 4” wide AC band as required |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |