Similar Projects
A & E Multiple Award Task Order Contract (MATOC)
Design
$3,500 to $100,000,000 est. value

RFP Design - Seminole County Supervisor of Elections Office
New Construction, Infrastructure
Bidding
$4,000,000 CJ est. value
Sanford, FL 32773

Vertical Region 4- Regional Architect and Engineering Indefinite Delivery Indefinite Quantity Contracts
Post-Bid
$100,000 to $30,000,000 est. value

Engineering, Planning and Development
Post-Bid

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

Florida Land Surveying IDIQ
Post-Bid
$5,000,000 est. value

Architect-Engineer Supplemental Services - Southeast Regional Office
Results

C--Multiple Award Task Order Contract (MATOC)
New Construction, Term Contract
Post-Bid

Nationwide Architect and Engineering IDIQ - Small Business Pool
Results
Less than $10,000,000 est. value

Microgrid Architectural And General Engineering Services
New Construction, Term Contract
Post-Bid
$10,000,000 est. value

Water Tank Inspections, OCONUS and CONUS
Results
$10,000 to $5,000,000 est. value

Unrestricted Architect-Engineering Airfield Paving Design MATOC
Term Contract
Post-Bid
Less than $30,000,000 est. value

NGB Fire Protection - National Architect and Engineering Indefinite Delivery Indefinite Quantity Contract
Results
$70,000 to $10,000,000 est. value
Washington, DC

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

Last Updated 10/17/2022 04:04 PM
Project Title

RFP Engineering - SR 15 (US 98) From NW 3rd St to NE 120th St

Physical Address View project details and contacts
City, State (County) Lake Mary, FL 32746   (Seminole County)
Category(s) Professional Services
Sub-Category(s) Engineering
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2025 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $14,080,931 [brand] Estimate
Plans Available from Project Manager
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 17, 2022, a shortlist of prospective firms has been released. Although a firm timeline for construction has not been determined, construction is not expected to start prior to fiscal year 2025. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) Selection Method : Selection Method : Letter of Response and Oral Presentation Financial Management Numbers : 44897413201 44897413202 44897613202 SR 15 (US 98) FROM NW 3RD ST TO NE 120TH ST TRC Members (Subject to Change) : Jennifer Freeman Kara Davis Stacy Hill The goal of the Department's Under-Utilization strategy is to encourage and promote use of Disadvantaged Business Enterprises (DBE) and Small Businesses in areas of work where they have been under-used. Under-Utilization is defined by FDOT as 25% or less utilization level in a Work Group, which may vary by district. The specific Under-Utilized Work Groups are identified in the advertisement. Consultants are strongly encouraged to propose a DBE or Small Business to perform services for each Under-Utilized Work Group identified in the advertisement. Sr 15 (Us 98) From Nw 3rd St to Ne 120th St; Sr 15 (Us 98) From Sw 23rd St to Sw 3rd St Direct all questions to the Department by emailing d1.profserv@dot.state.fl.us. Questions posed 72 hours prior to the response deadline will be responded to by the Department on the File Transfer Protocol (FTP) site Financial Management Number(s) 448974 1 32 01; 448974 1 32 02; 448976 1 32 02 Longlist Date/Time 7/12/2022 Shortlist Selection Date/Time 7/19/2022 Phase II Submittal Deadline Date/Time 8/03/2022 Technical Review Committee Meeting 1 Date/Time 8/04/2022 Oral Presentation Date/Time 8/04/2022 Final Selection Date/Time 8/16/2022 Negotiations Period Begin Date 8/24/2022 Negotiations Period Ending Date 10/01/2022 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - SR 15 (US 98) From NW 3rd St to NE 120th St

Details

Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents