Similar Projects
Railroad Avenue – CDBG 2016 – Water and Sewer System Improvements
Post-Bid
Cochran, GA

Magnolia Drainage Improvements
Post-Bid
Less than $275,000 est. value
Tifton, GA

Tradeport East Rough Grading and Drainage Improvements
Results
Less than $563,843 est. value
GA

Mobley Park Storm Drainage Improvements
Results
Port Wentworth, GA

Storm Drainage Improvements FY2018 CDBG
Post-Bid
Irwinton, GA 31042

Kennesaw Avenue Sidewalk and Drainage Improvements
Results
$350,000 to $500,000 est. value
Nelson, GA

Replacement of the Streets and Drainage Improvements
Post-Bid
Jesup, GA 31545

Exit 18 Erosion Control and Welcome Sign Installation
Results
La Grange, GA 30240

36” CMP Rehabilitation
Post-Bid
GA

Cherry-Church-Blanchard-King Avenues Drainage Improvements
Results
Pine Mountain, GA

T32-D6-Drainage Rehab-Pickens-97322
Post-Bid
GA

Sequoia Circle Drainage Improvements Phase II
Results
Hinesville, GA 31310

Drainage Base and Pave Construction
Post-Bid
Lyons, GA 30436

Pooler Old Town Drainage - Project B
Results
Less than $811,700 est. value
Pooler, GA 31322

T32-D6-Drain Rehab-Chattooga-97769
Post-Bid
GA

Reported 03/06/2020 12:00 AM
Project Title

Hanarry Point Drainage Improvement Project

Physical Address View project details and contacts
City, State (County) Lawrenceville, GA 30045   (Gwinnett County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed by the General Contractor consist of, but is not limited to the following major items: 1. Construction of a rip rap stormdrain channel, storm drain pipe slip-line, removal of sediment in Pew Creek, demolition, clearing & tree removal, grading, storm drain pipe instalation, erosion control and miscellaneous appurtenances. 2. The equipment and materials to be furnished by the Contractor will be installed at the locations shown on the drawings and/or as described in the respective section of these specifications. 3. All work shall comply with all Federal, State, and local requirements and specifications. 4. The latest GDOT Standard Specifications for Road and Bridge Construction of the Georgia Department of Transportation, shall govern the construction of this project.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents