Similar Projects
Tempie Avery Montford Center Boiler Replacement
Renovation
Sub-Bidding
$100,000 CJ est. value
Asheville, NC 28801

Shiloh HVAC Upgrades - Linwood Crump Shiloh Community Center
Renovation
Post-Bid
$200,000 CJ est. value
Asheville, NC 28803

Avery's Creek Elementary School DOAS Replacement - Rebid
Renovation
Post-Bid
$71,000 CJ est. value
Arden, NC 28704

Hvac Improvements (Design Build)
Alteration
Results
NC

Black Mountain Primary Entire Building Split System Indoor and Outdoor Unit Replacement
Alteration
Results
$145,500 est. value
Black Mountain, NC 28711

Remove and Replace Two (2) Domestic Boilers at North Buncombe Middle School
Renovation
Post-Bid
$200,000 CJ est. value
Weaverville, NC 28787

West Buncombe Elementary School Replace (2) Separated Combustion Makeup Air Handlers
Alteration
Results
$37,000 est. value
Asheville, NC 28806

HVAC Repair and Preventative Maintenance
Term Contract
Post-Bid
Asheville, NC 28801

Replace Chiller at C. C. Bell Elementary School
Alteration
Results
Asheville, NC 28805

Replace (2) Chillers at C.D. Owen Middle School
Alteration
Results
Swannanoa, NC 28778

Replace (2) Chillers at Candler Elementary School
Alteration
Results
Candler, NC 28715

Replace Chiller at Pisgah Elementary School
Alteration
Results
Candler, NC 28715

Replace Chiller at Weaverville Primary School
Alteration
Results
Weaverville, NC 28787

Replace Chiller at Woodfin Elementary School
Alteration
Results
Woodfin, NC 28804

Replace 35 Bard Units County Wide (Labor Only)
Alteration
Results
Asheville, NC

Last Updated 02/13/2023 05:32 PM
Project Title

Fairview Elementary School Chiller Replacement

Physical Address View project details and contacts
City, State (County) Fairview, NC 28730   (Buncombe County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $51,650 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Work shall consist of furnishing all labor, taxes, materials, equipment, services, permits, incidental and implied, to install a complete working system as designed per the attached drawings and specifications for the replacement of a chiller at Fairview Elementary School. Buncombe County Schools reserves the right to reject any and all bids for any or no reason, and to waive informalities. Buncombe County Schools reserves the right to reject any or all bids for any or no reason. DIRECT RFP INQUIRES TO Contact Person Email (Preferred) Phone Gerald Isbouts, Project Manager gerald.isbouts@bcsemail.org (828) 225-1108 Lisa Sharpe, Purchasing Manager lisa.sharpe@bcsemail.org (828) 255-5903

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents