Similar Projects
GLDTC 552 Crestwood Drive, GLDTC 557 Dacusville Highway and GLDTC 559 Sterling Community
Post-Bid
$1,500,000 to $2,500,000 est. value
Greenville, SC

GLDTC 567 - Rothwell Drive/ Millport Circle Relocation
Post-Bid
$500,000 to $1,000,000 est. value
Mauldin, SC 29662

Fairforest Way Rehabilitation Project - Phase 2
Results
Greenville, SC

Resurfacing/Reclamation CMRB of 19.04 Miles of Roads
Results
$3,000,000 to $5,000,000 est. value
Greenville, SC

SCTAC Durability Track
Post-Bid
Greenville, SC

Resurfacing/Reclamation CMRB of 28.21 Miles of Various Roads
Results
$6,000,000 to $9,000,000 est. value
Greenville, SC

Durability Track
Post-Bid
Greenville, SC

Site Work, Grading and Paving for Kids Planet Playground
Results
Greer, SC 29651

Construct a Trail Head and a Section of the Swamp Rabbit Trail along a .25 Easement
Post-Bid
Mauldin, SC 29662

GLDTC 556-Fountain Inn High School Road Improvements
Results
$2,000,000 to $3,000,000 est. value
Fountain Inn, SC 29644

GLDTC 560.01 MMRP FY 19-20
Results
$1,500,000 to $2,000,000 est. value
Greenville, SC 29601

S-183 Widening
Results
SC

Woodruff Road Area Improvements Project
Results
Greenville, SC 29602

Reconstruction/Rehabilitation - Greenville Co
Results
SC

Preservation - Greenville County
Results
SC

Last Updated 03/13/2020 05:24 AM
Project Title

Rehabilitation

Physical Address View project details and contacts
City, State (County) SC   (Greenville County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Removal & Disposal Of Existing Pavement 475.000 Sy Borrow Excavation 602.000 Cy Excavation For Shoulder Paving 62.304 Sta Hauling Of Excavated Shoulder Material 62.304 Sta Cement Modified Recycled Base (12" Unif)-Curing Method b 35,951.000 Sy Portland Cement For Cement Modified Recycled Base Course 1,726.000 Ton Maintenance Stone 702.540 Ton Hma Shoulder Widening Course 415.360 Ton Liquid Asphalt Binder Pg64-22 2,882.941 Ton Full Depth Asph. Pav. Patching 8" Unif 54,904.000 Sy Full Depth Asph. Pav. Patching 10"Unif 5,350.000 Sy Milling Existing Asphalt Pavement 2.0" 404,795.000 Sy Milling Existing Asphalt Pavement (Variable) 10,954.000 Sy Milled-In Rumble Strip 4.520 Mi Hot Mix Asphalt Intermediate Course Type b 1,849.174 Ton Hot Mix Asphalt Surface Course Type b 46,422.263 Ton Hot Mix Asphalt Surface Course Type c 4,017.920 Ton Driveway Paving-Surface Type c 1,103.775 Ton Permanent Construction Signs (Ground Mounted) 6,924.000 Sf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 123,000.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 174,074.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 33,366.000 Lf 12" White Solid Lines - Fast Dry Paint 994.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 13,126.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 168.000 Ea White Word Message "Only"-Fast Dry Paint 78.000 Ea White Combination Arrow(Str.& Rt.Or Str.& Lt.)Fast Dry Paint 56.000 Ea White Lane Drop Arrow (Left Or Right)-Fast Dry Paint 4.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 35,880.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 688,606.000 Lf 6" Yellow Solid Line On Curb/Median - Fast Dry Paint 2,740.000 Lf 4" White Broken Lines -(Gaps Excluded) - Epoxy Paint 110.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Epoxy Paint 1,670.000 Lf 4"Yellow Solid Lines-Pvt.Edge&No Passing Zone - Epoxy Paint 1,670.000 Lf 4" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 30,690.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 80,595.000 Lf 8" White Solid Lines Thermoplastic - 125 Mil. 16,683.000 Lf 12" White Solid Lines - Thermo. - 125 Mil. 497.000 Lf 12in x 18in White Triang. Yield Bar (Gaps Exc)Thermo-125mil 40.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Thermo.-125 Mil 6,613.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 84.000 Ea White Word Message "Only" -Thermoplastic - 125 Mil. 39.000 Ea White Combination Arrows(Str&Rt.Or Str&Lt)Thermo-125mil 28.000 Ea White Lane Drop Arrow(Lt.Or Rt.)Thermo-125mil 2.000 Ea 4" Yellow Broken Lines(Gaps Exc)Thermoplastic - 90 Mil. 8,760.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 170,758.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 1,749.000 Ea Permanent Yellow Pavement Markers Mono-Dir.- 4"x 4" Perm. Yel. 936.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 2,894.000 Ea Delineators, Single, Bi., Incl. Supports 50.000 Ea Furnish & Install 1.0" Schedule 80 Pvc Conduit 4,200.000 Lf Furnish & Instl No. 14 Copper Wire,1-Conductor For Loop Wire 75,400.000 Lf Sawcut For Loop Detector 27,400.000 Lf f&i-13"x24"x18"d.Elec.Flush Undgrd.Enclos-(Str.Poly.Conc.)Hd 60.000 Ea Furnish & Install Video Detection Camera w/ Hardware & Lead-In 47.000 Ea Adjust Drop Inlet Adjust d. i. 18.000 Ea Detectable Warning Material 237.500 Sf Pedestrian Ramp Construction 475.000 Sy Surface Applied Detectable Warning 870.000 Sf Remove & Dispose Semi-Rigid Gr Device 775.000 Lf Premash Reset w-Beam Strong Post System 1,805.000 Lf Premash Reset Type t Tl3 Leading 50` 1.000 Ea Premash Type t Tl3 Leading 50` 30.000 Ea Permanent Grassing For Non-Permitted Resurfacing Projects 2.918 Acre

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents