Similar Projects
Le Bon Vivant
New Construction - 21,877 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Wauwatosa, WI 53213

Mixed Use Building
New Construction - 193,000 SF
Conception
$10,000,000 CJ est. value
Wauwatosa, WI 53226

Edison Apartments
New Construction
Design
$20,000,000 est. value
Milwaukee, WI 53209

New Milwaukee Public Museum
New Construction, Infrastructure - 230,000 SF
Design
$240,000,000 CJ est. value
Milwaukee, WI 53202

Avenir Apartment Homes Phases II & III
New Construction - 96,557 SF
Post-Bid
$26,000,000 est. value
Milwaukee, WI 53202

Design, Development, Financing, and Operational Management
New Construction
Post-Bid
Milwaukee, WI

2022 Green Infrastructure Upgrades
Renovation, Infrastructure
Results
$317,000 to $553,000 est. value
Milwaukee, WI 53204

Powerline Trail Phase 1
Infrastructure
Results
Greenfield, WI

Phillis Wheatley Redevelopment
Renovation - 140,880 SF
Construction
$22,000,000 est. value
Milwaukee, WI 53206

The Watertown Multi Family Housing
New Construction - 145,000 SF
Construction
$14,300,000 est. value
Wauwatosa, WI 53226

BV+ Apartments
New Construction - 26,296 SF
Pending Verification
$800,000 est. value
Milwaukee, WI 53207

Drew Tower
New Construction, Infrastructure - 80,000 SF
Pending Verification
$50,000,000 CJ est. value
Wauwatosa, WI 53226

Harlow & Hem Development
New Construction
Conception
Wauwatosa, WI 53213

Nova Apartments
New Construction - 2,400 SF
Design
$35,000,000 est. value
Milwaukee, WI 53202

Equity Investors - Carver Park
Renovation
Post-Bid
Milwaukee, WI

Last Updated 03/21/2023 09:10 AM
Project Title

Edison School Apartments

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53209   (Milwaukee County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Multi-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $25,000,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 21, 2023, construction is underway. Trades are 60% awarded. The project is comprised of the adaptive reuse of an existing historic school building into 63 apartment homes, and the construction of 12 townhomes in a new two-story wood-framed structure. Please submit separate bids for the school and townhome portions of the project!! The project will require the following trades: Selective Demolition, Facility Remediation, Concrete Work, Precast, Gypsum Floor Topping, Concrete cutting, Unit Masonry, Veneer Masonry, Masonry Restoration, Structural Steel, Metal Railings, Miscellaneous Metals, Rough Carpentry - Labor, Prefabricated Trusses, Fabrication, Curtain Wall Installation, Finish Carpentry - Labor, Finish Carpentry - Material, Cultured Marble, General Contractors, Waterproofing, Insulation Systems, Roofing(Shingle), Roofing(Metal), Soffit, Fascia & Trim, Vinyl & Metal Siding, Cement Board Siding, Roofing (Membrane), Sheet Metal Flashing & Trim, Roof Specialties, Gutters & Downspout, Firestopping, Architectural Caulking, Steel Doors & Frames, Exterior Doors, Aluminum Entry Doors, Aluminum Storefronts, Windows, Finish Hardware, Power Assist Doors, Glass & Glazing, Flooring Restoration, Gypsum Drywall, Gypsum Plastering, Tiling, Acoustical Ceilings, Flooring, Wall Coverings, Painting / Staining, Pest Control, Signage, Partitions, Corner Guards, Toilet & Bath Accessories, Fireplaces, Fire Extinguishers & Cabinets, Postal Specialties, Wire Closet Shelving, Exterior Specialties, Commercial Equipment, Residential Appliances, Exercise Equipment, Window Treatments, Residential Casework, Countertops, Entrance Floor Mats, Site Furnishings FF&E, Elevators, Fire Protection, Plumbing, HVAC, Electrical, Rough-in for future Photovoltaic Collectors, Light Fixtures/Electrical Supply, Communications, Security System, Earthwork/ Excavation, Erosion Control, Shoring & Underpinning, Asphalt Paving, Site Concrete, Fencing, Landscaping, Water Services, Site Utilities, Sanitary Sewer, Storm Sewer.

Details

,, 156,829 SF - 140,091 SF. 2 Stories Above Grade, 16,738 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents