Similar Projects
Dryer 2 Tire Welding Repairs Phase 1
Renovation
Bidding
$800,000 CJ est. value
Milwaukee, WI 53207

Motor Fuel System Replacement at South Shore Water Reclamation Facility
Infrastructure, Renovation
Bidding
$270,000 CJ est. value
Oak Creek, WI 53154

On-Call Construction Services for Repairs to Aeration Basins at South Shore Water Reclamation Facility
Renovation, Term Contract
Post-Bid
Oak Creek, WI 53154

Dryer Indefinite Quantity Services
Term Contract
Post-Bid
Milwaukee, WI 53207

Bar Screen Nos. 1, 2, 4, 7 and 8 Rehabilitation and Bar Screen No. 6 Replacement
Results
Milwaukee, WI 53207

Tunnel 271 Piping Replacement and Structural Repairs
Renovation
Results
Milwaukee, WI 53207

West Plant Return Activated Sludge Channel Repair
Renovation
Post-Bid
Milwaukee, WI

Dryer 1 Ring and Pinion Gear Replacement and Alignment at the Jones Island Water Reclamation Facility
Renovation
Results
Milwaukee, WI 53207

Primary Clarifier Drain Valve and Gate Actuator Replacement
Renovation
Post-Bid
Milwaukee, WI 53207

Dryer 2 Alignment, Tire and Trunnion Repairs and Non- Destructive Evaluation (Nde) at the Jones Island Water Reclamation Facility
Renovation
Results
Milwaukee, WI 53207

Jones Island Water Reclamation Facility, Building 203 Grit Dewatering Screws #1, 2 and 3 Repairs
Renovation
Post-Bid
$125,000 est. value
Milwaukee, WI 53207

Dryer 5 Trunnion Replacement and Alignment at the Jones Island Water Reclamation Facility
Renovation
Results
Milwaukee, WI 53207

Dewatering and Drying Facility Standpipe Installation
New Construction
Results
Milwaukee, WI 53207

Jones Island Water Reclamation Facility Primary Clarifiers Drive Improvements
Renovation
Results
Milwaukee, WI 53207

Blending Improvements at South Shore Water Reclamation Facility
Renovation
Results
Oak Creek, WI 53154

Last Updated 09/15/2022 04:04 PM
Project Title

Jones Island Water Reclamation Facility Building 221 West Plant Secondary Clarifier#2 Repairs

Physical Address View project details and contacts
City, State (County) Milwaukee, WI 53207   (Milwaukee County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $183,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project contemplated herein consists of the Contractor performing repairs to West Plant Secondary Clarifier #2. The time for completion of the Contract shall be one hundred fifty (150) days from the date of Notice to Proceed. A. SCOPE There are eleven (11) final clarifiers in the West Plant of the secondary treatment process located at the Jones Island Water Reclamation Facility. The following specification describes the rebuild of the West Plant Secondary Clarifier #2 turntable. The stop gap minimum clearances have been reached, indicating that a rebuild/replacement of the upper turntables is necessary. Existing Equipment Description The existing clarifier drive for the West Plant Secondary Clarifiers #2 is a H40-LT (CW) 98” Dia. Tow-Bro® model made by Evoqua. A Baldor electric motor serial #VECP3581T with AC power and 1 hp at a max RPM of 1765 are attached to the drives. The drives are a Sew-Eurodrive model R47AM143-KS gear drive with a max RPM of 13 and a ratio of 139.99.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents