Similar Projects
Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

Thornton Road Improvements Project Phase I - Selma Highway to Peters Road
Infrastructure
Bidding
Casa Grande, AZ

McCulloch Boulevard Pavement Rehabilation Project
Infrastructure
Bidding
$1,055,400 est. value
Lake Havasu City, AZ 86403

Concrete Slope Paving at 2 Locations
Post-Bid
Window Rock, AZ 86515

Design-Build Services for Verde Connect Road, SR 260 to Cornville Road
Post-Bid
Prescott, AZ 86305

North Garden Avenue and Fry Boulevard Improvements
Results
$2,200,000 to $2,400,000 est. value
Sierra Vista, AZ

Phoenix-Casa Grande Highway (I-10) 1-17 (Split) to SR 202L (Santan)
Results
Chandler, AZ 85225

Attesa Motorsports Complex Phase 1
New Construction
Construction
Casa Grande, AZ 85122

Kayenta Shopping Center - Asphalt Seal Coating
Renovation - 113,174 SF
Construction
Kayenta, AZ 86033

Jasper Parkway South
Infrastructure
Design
$3,500,000 est. value
Prescott Valley, AZ 86314

Pavement Rehabilitation
Infrastructure
Bidding
Oro Valley, AZ

Job Order Master Agreement
Post-Bid
Nogales, AZ

Haekel Road Cold Patch Asphalt 2019
Results
Safford, AZ

Buckeye Pool & Parking Expansion
New Construction - 19,000 SF
Design
$1,450,000 est. value
Buckeye, AZ 85326

Last Updated 10/06/2021 11:53 AM
Project Title

GAOA Construction: Roosevelt Pavement Preservation

Physical Address View project details and contacts
City, State (County) Roosevelt, AZ 85545   (Gila County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents