Similar Projects
Hyde Park Restroom - 319615 - City of St.Joseph
New Construction, Infrastructure
Conception
$482,820 CJ est. value
Saint Joseph, MO 64504

Site Development - East Side Terminal Area - 47732185 - City Of Lee Summit
New Construction, Infrastructure
Conception
$2,653,000 CJ est. value
Lees Summit, MO 64064

SOFTBALL FIELD ARTIFICIAL PLAYING SURFACE AND FENCING
Infrastructure
Design
$300,000 CJ est. value
Kirksville, MO 63501

Purchase and Removal of a Carport
Infrastructure
Design
$10,000 CJ est. value
Kingston, MO 64650

Construction of the Access Control Points in support of the National Geospatial-Intelligence Agency
New Construction, Infrastructure
Bidding
$25,000,000 CJ est. value
Saint Louis, MO 63107

Harry S. Truman Dam Station Drainage and Unwatering System Replacement
Infrastructure
Bidding
$5,000,000 CJ est. value
Warsaw, MO 65355

Tannehill Apartments
Addition, Renovation, Infrastructure - 59,700 SF
Sub-Bidding
$10,500,000 CJ est. value
Moberly, MO 65270

Vande East Office Building
New Construction, Infrastructure - 82,892 SF
Sub-Bidding
$17,000,000 CJ est. value
Saint Louis, MO 63110

Preservation Square Phase 2B - Site Prep Package
Infrastructure
Post-Bid
Saint Louis, MO 63106

Riverside Redx CID Site Improvements Lot 2 And Riverside Redx Site Improvements Lot 1
New Construction, Alteration - 62,497 SF
Post-Bid
Riverside, MO 64150

Sitework Services
Term Contract
Results
Columbia, MO

McGrath Elementary School and ECC Sitework Package
Results
Brentwood, MO 63144

Element By Westin - Marriott / Springfield
New Construction, Infrastructure - 71,477 SF
Construction
$22,000,000 CJ est. value
Springfield, MO 65807

Ford Motor Company Stamping Plant / Liberty
Addition, Demolition, Infrastructure - 55,000 SF
Construction
$6,424,320 CJ est. value
Liberty, MO 64068

Lux Living South Kingshighway Boulevard Multi Residential
New Construction, Infrastructure
Pending Verification
$51,000,000 CJ est. value
Saint Louis, MO 63110

Last Updated 09/13/2022 06:32 PM
Project Title

Geothermal Wellfield #4

Physical Address View project details and contacts
City, State (County) Rolla, MO 65401   (Phelps County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $3,060,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall have as a goal, subcontracting with Minority Business Enterprise (MBE) of ten percent (10%), with Service Disabled Veteran Owned Business (SDVE) of three percent (3%); and with Women Business Enterprise (WBE), Disadvantage Business Enterprise (DBE), and/or Veteran Owned Business of ten percent (10%) of awarded contract price for work to be performed. Questions regarding the scope of work and commercial conditions should be directed to Pat Litty at (573) 341-4865 or littyp@mst.edu Information regarding bid results will be available the day following the bid opening by calling (573) 341-7618. Neither owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda (if any) obtained from sources other than the issuing office. All Contract Documents must be obtained by the Bidder from ADS to be an Eligible Bidder. The Owner reserves the right to waive informalities in bids and to reject any and all bids. CONSTRUCTION - DEMOLITION / GRADING 1. GARAGE WEST 8/15/22 TO 9/15/22 2. ROLLA WEST 1/3/23 TO 2/10/23 3. HAVENER EAST 3/1/23 TO 3/31/23 4. BERTELSMEYER WEST 3/31/23 TO 4/30/23

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents