Similar Projects
East Loop Ph IV FM 51 to Northbend
Bidding
Weatherford, TX

Intersection Improvement Highway :FM1006
Bidding
$597,313 est. value
TX

Streets, Sidewalk, and Concrete Pavement Repair
Post-Bid
League City, TX

Street Rehabilitation Program
Post-Bid
Azle, TX 76020

Construction of the Water, Sanitary Sewer and Drainage Facilities and Paving and Appurtenances to Serve Southern Colony Section 5
Results
Less than $278,500 est. value
TX

Rehabilitation of Existing Road
Results
Less than $339,106 est. value
TX

Asphalt Pavement Repair Highway IH0010
Bidding
$732,700 est. value
TX

Construct Concrete Paving and Misc.Conrete Pads at Lake Tombigbee Picnic Area
Post-Bid
Livingston, TX 77351

Galveston County Road and Bridge Facility
Results
Dickinson, TX 77539

Fort Bliss Paving IDIQ
Bidding
$10,000,000 to $25,000,000 est. value
Fort Bliss, TX

Paving Facilities for Bryan Road Phase II
Post-Bid
TX

Paving and Drainage Improvements to CR 427 (SH 110 to FM 2016) and CR 4167 (SH 110 to End)
Results
$904,580 est. value
Tyler, TX

Road Improvements to CR 292
Bidding
$945,000 est. value
TX 75707

Sealcoat Work at Various Locations
Post-Bid
Goliad, TX 77963

Road Improvements to CR 173, CR 177, CR 183 and CR 1260
Results
Less than $2,211,000 est. value
TX

Last Updated 02/06/2021 01:43 AM
Project Title

Intersection Improvements, Rt and Lt Turn Lanes

Physical Address View project details and contacts
City, State (County) TX   (Walker County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,225,967
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

100 6002 Preparing Row Sta 34.200 1 105 6105 Removing Stab Base and Asph Pav(15") Sy 2,164.000 2 110 6001 Excavation (Roadway) Cy 2,005.000 3 132 6006 Embankment (Final)(Dens Cont)(Ty C) Cy 6,547.000 4 161 6017 Compost Manuf Topsoil (4") Sy 28,775.000 5 164 6033 Drill Seeding (Perm) (Rural) (Sandy) Sy 28,775.000 6 164 6041 Drill Seeding (Temp) (Warm) Sy 14,389.000 7 164 6043 Drill Seeding (Temp) (Cool) Sy 14,389.000 8 168 6001 Vegetative Watering Mg 292.000 9 247 6312 Fl Bs (Cmp in Plc)(Ty D Gr1-2)(8") Sy 11,531.000 10 275 6001 Cement Ton 141.000 11 275 6010 Cement Treat (Subgrade) (8") Sy 11,531.000 12 310 6005 Prime Coat (Ae-p) Gal 2,309.000 13 316 6029 Asph (Rc-250) Gal 8,561.000 14 316 6080 Aggr(Ty-b Gr-5 Sac-a) Cy 231.000 15 354 6021 Plane Asph Conc Pav(0" to 2") Sy 19,032.000 16 403 6001 Temporary Spl Shoring Sf 494.000 17 416 6029 Drill Shaft (Rdwy Ill Pole) (30 in) Lf 8.000 18 416 6032 Drill Shaft (Trf Sig Pole) (36 in) Lf 28.000 19 416 6034 Drill Shaft (Trf Sig Pole) (48 in) Lf 22.000 20 420 6057 Cl C Conc (Wingwalls) Cy 34.000 21 432 6002 Riprap (Conc)(5 in) Cy 10.000 22 432 6009 Riprap (Conc) (Cl B) (4") Cy 0.350 23 432 6017 Riprap (Stone Ty R)(Dry)(18 in) Cy 24.000 24 432 6045 Riprap (Mow Strip)(4 in) Cy 55.000 25 462 6034 Conc Box Culv (10 Ft X 10 Ft) Lf 19.000 26 464 6005 Rc Pipe (Cl Iii)(24 in) Lf 136.000 27 464 6007 Rc Pipe (Cl Iii)(30 in) Lf 16.000 28 467 6395 Set (Ty Ii) (24 in) (Rcp) (6: 1) (P) Ea 6.000 29 467 6419 Set (Ty Ii) (30 in) (Rcp) (4: 1) (C) Ea 2.000 30 496 6004 Remov Str (Set) Ea 8.000 31 496 6005 Remov Str (Wingwall) Ea 2.000 32 496 6007 Remov Str (Pipe) Lf 136.000 33 500 6001 Mobilization Ls 1.000 34 502 6001 Barricades, Signs and Traffic Handling Mo 5.000 35 506 6002 Rock Filter Dams (Install) (Ty 2) Lf 441.000 36 506 6011 Rock Filter Dams (Remove) Lf 441.000 37 506 6020 Construction Exits (Install) (Ty 1) Sy 444.000 38 506 6024 Construction Exits (Remove) Sy 444.000 39 506 6038 Temp Sedmt Cont Fence (Install) Lf 3,348.000 40 506 6039 Temp Sedmt Cont Fence (Remove) Lf 3,348.000 41 512 6009 Port Ctb (Fur & Inst)(Low Prof)(Ty 1) Lf 8,030.000 42 512 6010 Port Ctb (Fur & Inst)(Low Prof)(Ty 2) Lf 520.000 43 512 6057 Port Ctb (Remove)(Low Prof)(Ty 1) Lf 8,030.000 44 512 6058 Port Ctb (Remove)(Low Prof)(Ty 2) Lf 520.000 45 530 6004 Driveways (Conc) Sy 444.000 46 530 6005 Driveways (Acp) Sy 161.000 47 533 6001 Rumble Strips (Shoulder) Lf 6,850.000 48 540 6002 Mtl W-beam Gd Fen (Steel Post) Lf 805.000 49 542 6001 Remove Metal Beam Guard Fence Lf 600.000 50 544 6001 Guardrail End Treatment (Install) Ea 6.000 51 544 6003 Guardrail End Treatment (Remove) Ea 4.000 52 610 6254 in Rd Il (Ty St) 40t-8 (250w Eq) Led Ea 1.000 53 618 6023 Condt (Pvc) (Sch 40) (2") Lf 165.000 54 618 6024 Condt (Pvc) (Sch 40) (2") (Bore) Lf 355.000 55 618 6033 Condt (Pvc) (Sch 40) (4") Lf 135.000 56 618 6034 Condt (Pvc) (Sch 40) (4") (Bore) Lf 235.000 57 620 6008 Elec Condr (No.8) Insulated Lf 1,605.000 58 624 6010 Ground Box Ty D (162922)w/apron Ea 5.000 59 628 6145 Elc Srv Ty D 120/240 060(Ns)ss(E)sp(O) Ea 1.000 60 644 6067 in Sm Rd Sn Sup&am (Inst Sign Only) Ea 2.000 61 644 6068 Relocate Sm Rd Sn Sup&am Ty 10bwg Ea 6.000 62 658 6062 Instl Del Assm (D-sw)sz 1(Brf)gf2(Bi) Ea 11.000 63 658 6075 Instl Om Assm (Om-2z)(Flx)srf(Bi) Ea 14.000 64 662 6032 Wk Zn Pav Mrk Non-remov (Y)4"(Brk) Lf 6,130.000 65 662 6034 Wk Zn Pav Mrk Non-remov (Y)4"(Sld) Lf 9,450.000 66 662 6093 Wk Zn Pav Mrk Remov (Y)4"(Brk) Lf 470.000 67 662 6095 Wk Zn Pav Mrk Remov (Y)4"(Sld) Lf 3,390.000 68 666 6054 Refl Pav Mrk Ty I (W)(Arrow)(100mil) Ea 14.000 69 666 6078 Refl Pav Mrk Ty I (W)(Word)(100mil) Ea 12.000 70 666 6167 Refl Pav Mrk Ty Ii (W) 4" (Brk) Lf 6,592.000 71 666 6170 Refl Pav Mrk Ty Ii (W) 4" (Sld) Lf 6,826.000 72 666 6178 Refl Pav Mrk Ty Ii (W) 8" (Sld) Lf 1,205.000 73 666 6182 Refl Pav Mrk Ty Ii (W) 24" (Sld) Lf 50.000 74 666 6205 Refl Pav Mrk Ty Ii (Y) 4" (Brk) Lf 2,312.000 75 666 6207 Refl Pav Mrk Ty Ii (Y) 4" (Sld) Lf 8,544.000 76 672 6009 Refl Pav Mrkr Ty Ii-a-a Ea 365.000 77 672 6012 Traffic Button Ty I-c Ea 65.000 78 677 6001 Elim Ext Pav Mrk & Mrks (4") Lf 20,156.000 79 680 6002 Install Hwy Trf Sig (Isolated) Ea 1.000 80 682 6003 Veh Sig Sec (12")led(Yel) Ea 4.000 81 682 6005 Veh Sig Sec (12")led(Red) Ea 4.000 82 682 6021 Back Plate (12")(1 Sec) Ea 8.000 83 684 6010 Trf Sig Cbl (Ty a)(12 Awg)(5 Condr) Lf 1,205.000 84 686 6043 Ins Trf Sig Pl Am(S)1 Arm(40')lum Ea 1.000 85 686 6047 Ins Trf Sig Pl Am(S)1 Arm(44')lum Ea 1.000 86 686 6191 Ins Trf Sig Pl Am(S)2 Arm(50 - 40')lum Ea 1.000 87 3077 6001 Sp Mixes Sp-b Pg64-22 Ton 3,025.000 88 3077 6052 Sp Mixes Sp-d Sac-a Pg70-22 Ton 3,231.000 89 6001 6002 Portable Changeable Message Sign Ea 2.000 90 6185 6002 Tma (Stationary) Day 79.000 91 6185 6005 Tma (Mobile Operation) Day 79.000 92

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents