Similar Projects
Airport Job Order Contractor (JOC) For General Contracting Construction Services
Results
Flagstaff, AZ 86005

Prescott Regional Airport PRC Security Upgrades
Renovation, Alteration
Results
$1,017,090 est. value
Prescott, AZ 86301

Replace AWOS at RYN
Results
Tucson, AZ 85735

Northwest General Aviation Redevelopment at Phoenix Sky Harbor International Airport
Renovation
Bidding
Phoenix, AZ 85034

CBP Relocation
Renovation
Results
$500,000 to $100,000 est. value
Tucson, AZ 85756

Glendale Municipal Airport Awos And Wind Cone Replacement
Renovation
Results
Glendale, AZ 85307

158 Passenger Facility
Design
Yuma, AZ 85365

Taxiway B and Connectors Reconstruction Project
Results
Less than $2,984,610 est. value
Winslow, AZ

PSHIA Terminal 4 Infrastructure Vertical and Horizontal Transportation Modernization - Phase 1
Bidding
$28,500,000 est. value
Phoenix, AZ 85003

T4S1 Common-Use Airport Lounge
Renovation - 3,500 SF
Results
Phoenix, AZ 85034

Casa Grande Airport Cafe Space Improvements Project
Post-Bid
Casa Grande, AZ 85122

On-Airport Commercial Aviation Related Development
Renovation
Post-Bid
Chandler, AZ 85286

PSHIA Terminal 4 South 1 Concourse Concrete Apron Design Bid Build
Results
Phoenix, AZ 85034

Terminal 3 North 2 Concourse
New Construction
Conception
Phoenix, AZ 85034

Last Updated 11/23/2021 02:08 PM
Project Title

Bisbee-Douglas International Airport Terminal Remodel

Physical Address View project details and contacts
City, State (County) Douglas, AZ 85607   (Cochise County)
Category(s) Transportation
Sub-Category(s) Airline/Passenger Terminal
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Task 1 – Remove and replace exterior windows as specified in architectural plans Task 2 - Prep exterior surface for application of stucco material in accordance with architectural design plans Task 3 – Demolition, removal, and disposal of walls, existing electrical, existing plumbing, plumbing fixtures, cabinetry, and other structures depicted in architectural plans of the existing conditions. Task 4 – Erect new walls that are depicted in the architectural plans. Task 5 – Install new plumbing (domestic water and sewer) Task 6 - Install a new electrical service entrance panel, install all new wiring, junction boxes, outlet boxes, plugs, switches, light fixtures, sub-panels, data junction boxes and data outlets in accordance with architectural plans. Data drop boxes must have conduit up to the top of the ceiling grid. Task 7 – Install a fire suppression sprinkler system and tie it into a fire alarm system with smoke detectors Task 8 – Hang 5/8” sheetrock, or as specified in architectural plans. Tape and texture walls (texture is hawk & trowel finish look). Task 9 - Make necessary modifications to HVAC supply ducts and returns, to ensure new rooms have adequate air flow and return. Task 10 – Prep and mask off walls for painting. Primer new walls and paint the complete interior of the building using Dunn Edwards Suprema eggshell finish paint. The walls will be painted in “miner’s dust” color, while door frames will be painted in Dunn Edwards Suprema eggshell enamel finish (color = Draw Your Sword). Task 11 - Install ceiling grid and ceiling tiles in accordance with architectural plans Task 12 – Install flooring – consult with owner to determine color, design and pattern Task 13 – Install plumbing fixtures – toilets, lavatories, sinks, faucets, etc. Task 14 – Install finishing touches to electrical items Task 14 – Cochise County I.T. staff will feed and wire data boxes Task 15 – Clean work area prior to departure; to include dusting and vacuuming.

Details

1 Airline/Passenger Terminal, Renovation.
Division 01 - General Requirements, Cleaning and Waste Management, Final Cleaning.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents