Similar Projects
Minocqua - Manitowish
Infrastructure
Conception
$2,000,000 CJ est. value
Rhinelander, WI 54501

Rhinelander - Eagle River Const / Pavement Replacement
Infrastructure
Bidding
$3,000,000 CJ est. value
Rhinelander, WI 54501

Courthouse Front Stoop CDBG Project
Renovation
Post-Bid
$25,000 est. value
Rhinelander, WI 54501

Public Safety Complex Addition and Remodel Nicolet College Rhinelander Campus
Addition, Demolition, Infrastructure - 2,248 SF
Post-Bid
$750,000 CJ est. value
Rhinelander, WI 54501

Torpy Park Sanitary Improvements
Infrastructure
Results
$200,000 est. value
Minocqua, WI

2023 Oneida Avenue Area Utility and Street Improvements
Infrastructure
Results
$5,803,643 CJ est. value
Rhinelander, WI 54501

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Refurbishing an Aeration System at Horsehead Lake
Infrastructure
Post-Bid
$260,000 CJ est. value
Lake Tomahawk, WI 54539

Old Highway 70 Rehabilitation Project
Infrastructure
Results
$988,671 CJ est. value
Minocqua, WI 54548

RFP D/B - Snowmobile Trail Bridge - Clintsman CTY K and153
New Construction, Infrastructure
Post-Bid
$500,000 CJ est. value
Tripoli, WI 54564

Superior Street Sidewalk Improvements
Infrastructure
Results
$614,072 CJ est. value
Three Lakes, WI 54562

Paving
Infrastructure
Post-Bid
$500,000 CJ est. value
Cassian, WI 54529

2023 West School Street Improvements
Infrastructure
Results
$221,119 CJ est. value
Three Lakes, WI 54562

Cobblestone Hotel & Suites / Rhinelander
Renovation, Infrastructure
Post-Bid
$750,000 CJ est. value
Rhinelander, WI 54501

2023 CTH B Culvert Replacement
New Construction, Infrastructure
Post-Bid
$150,000 CJ est. value
Schoepke, WI 54463

Last Updated 08/16/2023 12:57 PM
Project Title

Town of Newbold - Town Hall

Physical Address View project details and contacts
City, State (County) Rhinelander, WI 54501   (Oneida County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Capitol/Court House/City Hall, Site Development
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status Construction Commenced, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This project per public sources is under construction and is anticipated to be complete by November 2023. Town Hall Permanently Closed. Bids To: Owner Bids Due: Accepting separate sealed bid proposals for the following divisions of work: Earthwork, Demo, Well, Hot Mix Asphalt Paving, Concrete, Masonry, Rough Carpentry, Finish Carpentry, Building Insulation, Asphalt Shingled Roof, Metal Roof, Composition Siding, Rolling Shutter, Aluminum Storefront and Windows, Gyp Board Assembly, Flooring, Cabinets & Millwork, Acoustical Panel Ceiling, Painting and Finishing, Plumbing, HVAC, Electrical & Security System, and Signage. Delivery: Request for bids. Architect/Construction Manager: Keller, Inc., N216 Road 55, Kaukauna, WI 54130. Prevailing Wages: Not Required. Bid Bond: Bid bond is not required to be provided at date of bid opening. Awarded bidder will be required to furnish bid bond or certified check within 7 days of board approval. Bid bond or certified check must be equal to at least 10% of the amount bid, payable to the Owner as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 30 days after the award of the contract. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 30 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the Owner as liquidated damages Performance Bond: 100% of the Contract Price Required Payment Bond: 100% of the Contract Price Required Qualification Statement: Bidders shall submit a Contractor Proof of Responsibility form provided in the specifications to Town of Newbold. Submit form to: Clerk Office, Attn: TOWN HALL BID; 6103 Point Drive Rhinelander, WI 54501. Schedule: Project is anticipated to start in March of 2023 and be substantially complete by September, 2023. Notes: The low responsive, responsible bidder will be recommended for contract award. Owner reserves the right to reject any or all bids, to waive technicalities in bid or to accept a bid which will be in the best interest of the Owner. Bids shall remain open to acceptance for a period of 30 days after bid due date. Project Scope: In general the project consists of an approximate 5,200 sq. ft. new town hall. Project consists of the following divisions of work: Earthwork, Demo, Well, Hot Mix Asphalt Paving, Concrete, Masonry, Rough Carpentry, Finish Carpentry, Building Insulation, Asphalt Shingled Roof, Metal Roof, Composition Siding, Rolling Shutter, Aluminum Storefront and Windows, Gyp Board Assembly, Flooring, Cabinets & Millwork, Acoustical Panel Ceiling, Painting and Finishing, Plumbing, HVAC, Electrical & Security System, and Signage.

Details

5,200 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents