Similar Projects
Margate Park Improvements - City of Daly City
Infrastructure
Conception
$5,000,000 est. value
Daly City, CA 94015

Permanent Emergency Bypass Transmission Main on East Third Avenue (FY 2025-2026) - WA-04 - City of Foster City
Infrastructure
Conception
$300,000 est. value
Foster City, CA 94404

Repair a Damage Storm Drain System and Rebuild Nearby Eroded Embankment
Infrastructure
Design
$1,092,000 est. value
Half Moon Bay, CA 94019

Sneath Lane Residential Subdivision
New Construction, Infrastructure
Design
$50,000,000 CJ est. value
San Bruno, CA 94066

Theater Way Street Closure Project
Infrastructure
Bidding
$300,000 CJ est. value
Redwood City, CA 94063

Guadalupe River Bridge Replacement Project
Demolition, New Construction, Infrastructure
Bidding
$27,000,000 CJ est. value
San Jose, CA 95113

Jefferson Union High School District District Office and Adult Education Buildings - LLB Project
New Construction, Infrastructure - 68,000 SF
Sub-Bidding
$18,500,000 CJ est. value
Daly City, CA 94015

2022 Sanitary Sewer Mains Cleaning and Video Inspection
Term Contract
Sub-Bidding
Hillsborough, CA 94010

Positive Location of Underground Utility Facility (Potholing) Services
Infrastructure
Post-Bid
$1,400,000 est. value

Replacement of 8-Inch Pipeline Under Pilarcitos Creek (Strawflower) Project
Alteration
Post-Bid
$372,000 est. value
Half Moon Bay, CA 94019

Avenues Three and One Sewer and Water Main Replacement
Infrastructure
Results
San Bruno, CA

2021-2022 Watermain Replacement Project - Brookline
Alteration
Results
$693,000 to $75,000 est. value
Redwood City, CA

South ECR WMR, Phase 1 Sanchez to Barroilhet - City of Burlingame
Infrastructure
Construction
$5,113,000 est. value
Burlingame, CA

Millbrae Serra Station
New Construction, Infrastructure - 294,000 SF
Pending Verification
$460,000,000 CJ est. value
Millbrae, CA 94030

Stanford Wedge Faculty Residences and Workforce Housing Units
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Portola Valley, CA 94028

Last Updated 08/03/2022 02:01 PM
Project Title

Burlingame Terrace Subdivision Phase 2 - City of Burlingame

Physical Address View project details and contacts
City, State (County) Burlingame, CA 94010   (San Mateo County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $3,400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Burlingame Terrace Subdivision Phase 2 A detailed scope is not available. Project is included in the City of Burlingame's FY 2023-2027 CIP. As of August 3, 2022, information regarding a design team or a general contractor is not available. Funding is anticipated in FY 2025 and FY 2027.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents