Similar Projects
RFP - On-Call Environmental Engineering and Hazardous Materials Testing, Consulting
Term Contract
Conception
Berlin, CT 06037

RFP - Task Order Environmental Soil and Groundwater Services
Term Contract
Conception
$15,000,000 CJ est. value
Newington, CT 06111

King Street Distribution and Flex Buildings
New Construction - 600,350 SF
Design
Enfield, CT

USACE Philadelphia District-wide SRM MATOC
New Construction
Design
$25,000,000 to $100,000,000 est. value
Philadelphia, PA 19107

Installation of Engineered Control at 55 Steele Boulevard
Renovation
Bidding
$300,000 CJ est. value
Berlin, CT 06037

Lavery Law Enforcement Center Emergency Response and Storage Space Renovations
Renovation
Bidding
$28,810,608 CJ est. value
Newington, CT 06111

50 Jennings Road Electrical Distribution and Generator Replacement
Renovation
Sub-Bidding
$70,000 CJ est. value
Hartford, CT 06120

Custodial services at 450 Columbus Boulevard
Term Contract
Sub-Bidding
Hartford, CT 06103

Critical Repairs at David Pinney Brick Barn
Renovation
Post-Bid
Windsor Locks, CT

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

Y--Design Build, Design Bid Build, Indefinite Delivery, Indefinite Quantity Multiple Award Construction Contract For Facilities In The North Aor.
Results
Less than $95,000,000 est. value

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Results
$3,000,000 to $15,000,000,000 est. value

Renovations at Bristol City Hall
Renovation
Construction
Bristol, CT 06010

Landscaping Improvements at Pulaski Gateway
Infrastructure
Bidding
$30,000 CJ est. value
Hartford, CT 06103

Process Gravel Crushing Operation
Term Contract
Sub-Bidding
S Glastonbury, CT 06073

Last Updated 08/04/2022 01:08 PM
Project Title

HVAC, Weatherization, and Environmental Contractors

Physical Address View project details and contacts
City, State (County) Hartford, CT 06103   (Hartford County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $180,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Community Renewal Team (CRT) is requesting proposals from qualified licensed; HVAC, Weatherization, and Environmental Contractors in Connecticut. The purpose of this RFP process is to identify the most qualified respondents to develop a pre-qualified list of Contractors for Weatherization Assistance Program related work. All inquiries or questions concerning this Request for Proposals and the procurement process must be submitted in writing and can be sent by electronic mail to Jeanette Dunbar at dunbarj@crtct.org. In no case shall oral communications take precedence over written communications. Only written communications shall be binding on the RFP To RSVP for the in-person conference please email Jeanette Dunbar at dunbarj@crtct.org no later than July 20, 2022, by 3pm. All instructions for the RFP will be reviewed at the Bidders Conference and will acquaint all potential bidders with the project and field technical and administrative questions. Questions received in advance will be responded to at the Bidders Conference. Questions regarding the RFP will be accepted up until July 25, 2022 and responses will be posted on July 28, 2022. Bids will not be accepted from any Contractor that did not attend the mandatory pre-bid conference. Contractors shall furnish all supervision, technical, personnel, labor, machinery, tools, equipment, services and materials; and perform all required work as may be specified by work order(s) as provided herein. Materials supplied by the Contractor to be used in the work contemplated herein shall meet or exceed Federal specifications as set forth in Appendix A of 10 CFR Part 440, the State of Connecticut US DOE Weatherization State Plan for Low Income Persons, the Field Implementation Manual requirements from the State of Connecticut Department of Energy and Environmental Protection (DEEP) Weatherization Field Guide and NREL SWS Guide, all guidelines related to Weatherization Readiness Funds (WRF) in accordance with the WRF Plan available in the PY22 CT WAP State Plan and on the CT WAP Website, and the Weatherization Program Notice 22-6. Contractors will deliver one (1) original and two (2) copies of the proposal and attachments required. Please submit the completed quote forms and any necessary attachments in a sealed envelope clearly labeled with the name of the contractor, address, and the words "WXDOE-WAP2022". Envelopes must be plainly marked with the RFP number and RFP title to ensure appropriate handling of the sealed proposal. All work must be completed within 45 days of the date of the Work Order

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents