Similar Projects
2023 Tree Trimming Services for the North Little Rock Electric Department
Term Contract
Sub-Bidding
North Little Rock, AR 72114

Brownfields Qual. Environ. Professional
Post-Bid
AR

Weatherization Assistance Program (WAP)
Alteration
Post-Bid

Hazardous Materials Abatement Services
Alteration
Results
North Little Rock, AR 72114

Asbestos Abatement
Alteration
Results
North Little Rock, AR 72118

PBA Environmental Engineering Services
Term Contract
Post-Bid
White Hall, AR 71602

Removal of Asbestos Containing Materials and Demolition of Various Buildings Phase 3
Demolition, Alteration
Results
AR

West Fork Stream Restoration
Infrastructure
Post-Bid
Winslow, AR 72959

Demolition and Site Clearance of 118 East Washington Avenue (Former Greyhound Bus Station)
Demolition, Infrastructure
Results
$71,400 CJ est. value
North Little Rock, AR 72114

Removal of Asbestos
Alteration
Post-Bid
AR

Demolition and Site Clearance at Seventeen (17) Locations
Demolition, Infrastructure
Results
$116,965 CJ est. value
North Little Rock, AR 72114

Limited Asbestos Abatement
Alteration
Post-Bid
AR

Osceola Air Quality Project - Phase 2
Alteration
Post-Bid
Osceola, AR 72370

Benton County - FEMA Riverdale Road Structure Demolition Rebid
Demolition, Infrastructure
Post-Bid
Siloam Springs, AR 72761

Asbestos Abatement
Alteration
Post-Bid
Bryant, AR

Last Updated 09/09/2022 11:02 AM
Project Title

Clearing and Cleanout of the Districts 5 Ditch (Big Bay Ditch)

Physical Address View project details and contacts
City, State (County) Jonesboro, AR 72401   (Craighead County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Bay & St. Francis Drainage District #29 of Craighead County, Arkansas from County Road 672, connecting to the end of the recent clearing project, the North to County Road 986, 1 mile north of Hwy 18. Estimated 5 miles, but exact mileage to be determined by bidders. Work to be done on both sides of the ditch, with clearing of brush and trees, and removal of silt and other obstructions down to the original depth and width of ditch. This clearing and depositing of soil to be within 12 feet of top of bank. Any tree on back exceeding 6 inches diameter shall be cut at ground level, and root wad left in place for stability. Where this 12 foot area is now used for crops or farm road, the soil shall be leveled and made passable. Woody growth shall be piled and either buried or burned. Arkansas license required.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents