Similar Projects
MO 370 Interchange Ramp at Salt River Road, Phase 1
Infrastructure
Bidding
$400,000 est. value
Saint Peters, MO 63376

Full Depth Asphalt Reconstruction Project
Infrastructure
Bidding
$400,000 est. value
Saint Charles, MO

Parks Asphalt Paving
Infrastructure
Post-Bid
Foristell, MO 63348

Asphalt Removal and Replacement
Infrastructure
Post-Bid
Cottleville, MO

City Hall Parking Lot Maintenance and Improvements
Results
Weldon Spring, MO

2021 District Concrete
Results
Dardenne Prairie, Lake Saint Louis, O'Fallon, Wentzville, MO 63385

Pinkerton Properties Warehouse
New Construction, Alteration - 24,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
O'Fallon, MO 63366

Chicken N Pickle
New Construction, Term Contract - 32,923 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Saint Charles, MO

Wentzville Parkway and I-70 Interchange
Infrastructure
Bidding
$400,000 est. value
Wentzville, MO

Implementing Traffic Control Signaling Devices and Roadway Improvements
Infrastructure, Alteration
Post-Bid
Wentzville, MO

Pavement Sealing and Striping of Justice Center and Water Treatment Facilities Parking Lots
Results
Saint Peters, MO

2022 Crackseal Program
Infrastructure
Bidding
$300,000 est. value
O'Fallon, MO

Muegge Road
New Construction, Infrastructure
Post-Bid
Saint Charles, MO 63302

Great Oaks Turn Lane Addition
Infrastructure
Results
Wentzville, MO

MODOT Statewide Annual Plant (Cold) Mix Oil Material - Premix
Infrastructure
Post-Bid

Last Updated 07/12/2022 12:04 AM
Project Title

Resurface, Signals, and ADA

Physical Address View project details and contacts
City, State (County) Wentzville, MO   (Saint Charles County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $750,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

(1): Job J6S3312 Route N ST CHARLES County. Resurface, signals, and ADA from east of Stump Rd to west of Route K, the total length of improvement being 1.868 miles. (2): Job J6S3491 Route Z ST CHARLES County. Resurface from route N to Perry Cate Blvd, the total length of improvement being 1.105 miles.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents