Similar Projects
Above Ground Fuel Tank Storage System
Infrastructure
Post-Bid
Lodi, WI 53555

Fort Mccoy Central Fuels Repair
Term Contract
Post-Bid
Fort McCoy, WI

Capitol Drive Airport Fuel System Upgrade
Results
Pewaukee, WI 53072

2020 Chemical Phosphorus Improvements
Results
Waterloo, WI 53594

Fuel System Relocation and Upgrade
Alteration
Post-Bid
Appleton, WI

Fueling Facility Upgrades
Results
McFarland, WI 53558

Fuel System Upgrade
Alteration
Post-Bid
Oconomowoc, WI 53066

Installation of Radon Gas Mitigation System
Results
Milwaukee, WI 53207

Fuel Tank Replacement and Infrastructure
Infrastructure
Post-Bid
Nashotah, Sussex, WI 53058

Fueling System Removal
Results
Less than $258,500 est. value
Wisconsin Rapids, WI

Hartford Municipal Airport
New Construction
Post-Bid
Madison, WI

Landfill Phase 4 Gas System
Results
$210,300 est. value
Janesville, WI

Engineering Hall Sprinkler and Gas Piping-Phase 1 - GPC
Infrastructure, Alteration
Post-Bid
$3,500,000 est. value
Madison, WI 53706

DPW Yard Fuel Tank Replacement
Results
Greenfield, WI 53220

XPO Logistics Tanks
Alteration
Post-Bid
Tomah, WI 54660

Last Updated 01/25/2022 07:35 AM
Project Title

Hydrant Fuel System Replacement

Physical Address View project details and contacts
City, State (County) Milwaukee, WI   (Milwaukee County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value $25,000,000 to $100,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes constructing a new consolidated fueling facility that includes aboveground fuel storage tanks, pump house with control room, product recovery tank, POL operations building with a laboratory, refueling vehicle parking, truck loading and unloading points, motor gas storage tank, diesel storage tank, and supporting facilities.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents