Similar Projects
Phoenix Goodyear Airport Construct New Apron and Taxiway Connector
Infrastructure
Conception
$7,102,620 est. value
Goodyear, AZ 85338

West Air Cargo Apron Reconstruction
Infrastructure
Conception
$8,000,000 est. value
Phoenix, AZ

Skybridge at Phoenix-Mesa Gateway Airport New Building Expansion
Post-Bid
Mesa, AZ 85212

Rehabilitate Runway 01/19 Rehabilitate Taxiway Connectors A1, A2, & A3
Alteration
Post-Bid
Parker, AZ

Repair Alert Aircraft Apron
Results
$1,000,000 to $5,000,000 est. value
Tucson, AZ

Mesa Falcon Field Airport Reconstruct Higley Ramp
Results
$3,000,000 to $5,000,000 est. value
Mesa, AZ

General Apron Rehabilitation
Alteration
Post-Bid
$2,000,000 to $2,500,000 est. value
Yuma, AZ

Delta Apron Rehabilitation Phase 2 and Improvements
Results
Scottsdale, AZ 85260

Westside Runway Safety Area Grading and Drainage Improvement Project
Infrastructure
Post-Bid
$6,500,000 est. value
Bullhead City, AZ 86429

Scottsdale Airport Runway Rehabilitation Project
Results
$11,000,000 est. value
Scottsdale, AZ 85260

Taxiway W Rehabilitation
Infrastructure
Post-Bid
Phoenix, AZ

Improvements to Kayenta Airport Runway 5/23 Repair
Results
$350,000 est. value
Kayenta, AZ 86033

Phoenix Sky Harbor International Airport New Crossfield Taxiway U Construction Manager at Risk Services
Infrastructure
Post-Bid
$220,000,000 est. value
Phoenix, AZ

Kingman Airport - Runway 3-21 Rehabilitation
Results
Less than $1,946,482 est. value
Kingman, AZ 86401

Falcon Field Higley Ramp East Reconstruction
Results
$500,000 to $700,000 est. value
Mesa, AZ 85215

Last Updated 10/07/2021 09:40 AM
Project Title

Airfield Safety Enhancement (Ase) Program - Dbb1 Services

Physical Address View project details and contacts
City, State (County) Tucson, AZ 85756   (Pima County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of constructing asphalt Taxiways F, G and D3 as part of the ASE Program. In order to construct these taxiways, demolition must occur for a portion of the West Ramp including some existing cargo hanger buildings. The Taxiways will be constructed out of bituminous asphalt. The scope of work includes airfield taxiways, earthwork, electrical, drainage, pavement markings, airfield signage, PCC Paving, asphalt paving, aggregates, grading, landscaping, erosion control, AOA fence installation and vehicle service road construction. Scope includes potential visual screen construction as a bid alternate to the contract. Associated with the Project is the Az Air National Guard (AANG) Items (BAK Installation and expanded Arm/De-Arm Pad and jet blast wall).The AANG is funding these items to assist with the expansion of their existing Arm/De-Arm Pad. Additionally, an aircraft arresting system Barrier Arresting Kit (BAK) system will be installed in Runway 3-21.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents