Similar Projects
Student Housing Capacity Expansion
Addition
Conception
Pittsburgh, PA

Pittsburgh Institute of Mortuary Science - Parking Lot
Renovation - 3,600 SF
Conception
Pittsburgh, PA 15206

R.K. Mellon Science Building
Renovation
Post-Bid
$200,000,000 est. value
Pittsburgh, PA 15213

Forbes Road Career & Technology Center - Fork Lift Bid
Renovation
Post-Bid
Monroeville, PA 15146

Design Assist RFQ - Ostermayer Lab Building Renovation
Renovation - 21,739 SF
Results
PA

Surveillance System
Renovation
Results
$68,700 est. value
Monroeville, PA 15146

Osteopathic Medicine School
New Construction - 115,000 SF
Construction
$21,819,095 est. value
Pittsburgh, PA 15219

CMU Institutional Master Plan - South Wing of Wean Hall Building 2
Renovation
Construction
$350,000 est. value
Pittsburgh, PA 15213

R.K. Mellon Science Building at Oakland Campus Carnegie Mellon University
New Construction, Infrastructure - 425,000 SF
Pending Verification
$230,000,000 CJ est. value
Pittsburgh, PA 15213

Integrated Health Sciences Complex - University of Pittsburgh
Demolition, New Construction, Infrastructure - 900,000 SF
Conception
$100,000,000 CJ est. value
Pittsburgh, PA 15213

Chevron Science Center Renovations - University of Pittsburgh, Oakland Campus (Main Campus)
Renovation
Post-Bid
$4,000,000 CJ est. value
Pittsburgh, PA 15213

Roof Replacement - Student Services Center - Allegheny Campus
Renovation
Results
$553,350 CJ est. value
Pittsburgh, PA 15212

CMU Institutional Master Plan - New Scaife Replacement Building 3
New Construction, Renovation - 85,000 SF
Construction
Pittsburgh, PA 15213

Hillman Library Renovation Phase IV General Trades
Addition, Term Contract, Renovation - 70,188 SF
Post-Bid
$25,000,000 CJ est. value
Pittsburgh, PA 15260

Antonian Hall 6th Floor Renovations
Renovation
Construction
Pittsburgh, PA 15213

Last Updated 01/27/2023 08:32 AM
Project Title

VAC Ground Floor Renovations - General and Plumbing

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA 15212   (Allegheny County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $230,680 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of January 27,2023, project was awarded to Tail Industries $137,480.00 and First American $93,200.00.** Provide all labor, material, equipment, permits and supervision required to perform general construction (electrical and HVAC sub to GC) and plumbing construction (fire protection sub to PC) - Allegheny Campus in accordance with specification, terms and conditions contained herein. For questions, contact Mike Cvetic (mcvetic@ccac.edu), Director of Purchasing no later than three business days before the bid due date X Bid Bond. . . . . . . . . . . . . 10% of total base bid amount (Submit with Bid) X Performance Bond. . . . . 100% of total contract amount (Awardee Only) X Payment Bond. . . . . . . . 100% of total contract amount (Awardee Only) X Master Services Agreement (Awardee Only) X No Lien Agreement (Awardee Only) X Insurance Certificate (Awardee Only) BID BOND: Bid must include the required bid bond or certified check, which will be returned to the unsuccessful bidder approximately 45 days after the bid due date. PERFORMANCE BOND: The successful bidder will be required to enter into a written contract with the College and to furnish a contractors bond conditioned for the faithful and full performance of the contract with sufficient surety in the amount stated above. Any surety cosigning the contractors bond shall be an Incorporated surety company approved by the Court of Common Pleas of Allegheny County. Bond with surety must be furnished within 20 days after receipt of the contract. The Board of Trustees reserves the right to reject any bond furnished where it is in the best interest of the College to do so. The College requires Power of Attorney attached to bonds to be dated concurrently, sealed, and executed by a proper live (not facsimile) signature. PAYMENT BOND: The bidder to whom the contract is awarded shall furnish a bond to guarantee the payment of third-party subcontractors involved in fullment of services rendered against College contracts. Such bonds shall be with sufficient surety and in the amount stated above. Failure on the part of the contractor to furnish such bond shall be just cause for cancellation of award. NO LIEN AGREEMENT AND/OR INSURANCE CERTIFICATES: As required by the College, the No Lien Agreement and/or Insurance Certificate may be requested of the successful bidder The board of trustees reserves the right to reject any or all bids. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bid Result Base bid 1 - Tail Industries - $137,480 Base bid 2 - First American Industries - $93200

Details

Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents