Similar Projects
Babcock Street Widening at St Johns Heritage Parkway (SJHP)
Infrastructure
Bidding
$4,375,277 est. value
Palm Bay, FL

Road Bond Paving Emerson Drive North West from Amador Avenue North West to Jupiter Boulevard North West
Infrastructure
Bidding
$1,265,076 est. value
Palm Bay, FL 32907

St. Michael Place Extension Phase 3
Post-Bid
Melbourne, FL 32901

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Pineapple Complete Streets Project
Results
$1,119,730 est. value
Melbourne, FL 32935

Front Street Complete Streets Project
Results
Melbourne, FL 32901

FPL Cocoa Service Center Paving Improvements
Alteration
Post-Bid
Cocoa, FL 32922

CDBG Paving Improvements Project FY20/21
Results
Less than $180,762 est. value
Titusville, FL

Road Bond Paving Unit 30
Infrastructure
Post-Bid
$11,612,476 est. value
Palm Bay, FL

Traffic Signals
Results
Less than $1,700,843 est. value
Melbourne, FL 32940

Harper Boulevard at C-18 Culvert Replacement
Alteration
Post-Bid
$430,325 est. value
Palm Bay, FL 32908

Asphalt Construction, Sealing & Striping
Results
$300,000 est. value
FL

Pre-Event Emergency Roadside Assistance Services
Results

Miscellaneous Roadside Repair
Infrastructure
Results
$400,000 est. value

Strategic Resource Evaluation Study - Highway Construction Materials
Infrastructure
Results

Reported 06/25/2022 12:00 AM
Project Title

KARS 1 Repave Hall Road / Kennedy Space Center

Physical Address View project details and contacts
City, State (County) FL   (Brevard County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of this project includes, but is not limited to, the following: Remove and replace approximately 1 mile stretch of Hall Road at the entrance to KARS 1 facility to include lane markers. As of June 2, 2022, a general contractor has not yet been selected for this project. A firm construction timeline for this project has not yet been released.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents