Similar Projects
CDBG - Public Work Drainage Improvements Project
Bidding
$165,041 est. value
Hallandale Beach, FL 33009

Slope Rehabilitation
Bidding
Less than $400,000 est. value

Picayune Strand Restoration Project, US41 and CR92 Conveyance Features
Post-Bid
$5,000,000 to $10,000,000 est. value
Goodland, FL

Monterra Lake Bank Stabilization
Post-Bid
Coral Springs, FL

CBJTC Precinct Road North Culvert Replacement
Results
Less than $500,000 est. value
Starke, FL 32091

CBJTC North Tank Trail Emergency Repair
Results
Less than $350,000 est. value
Starke, FL

Remove Accumulated Silt
Bidding
$115,000 est. value
Gainesville, FL

Retention Pond Work Early Education
Renovation
Post-Bid
Panama City, FL

CBJTC East Bay Road Washout Repair
Results
Less than $500,000 est. value
Starke, FL 32091

Culvert Pipe Replacement Tranter Ave at Canal C-41R
Bidding
GRANT VLKRIA, FL 32909

Stormwater Pond Bulkhead Improvements
Post-Bid
FL

CBJTC Gulfport Street Washout Repair
Results
Less than $420,000 est. value
Starke, FL 32091

Bamford Sports Complex - Drainage Pipe Restoration
Bidding
$25,000 est. value
Davie, FL 33328

Callaway Point Drainage Improvement Project
Post-Bid
Callaway, FL 32404

CBJTC Mosley Road Washout Repair
Results
Less than $500,000 est. value
Starke, FL 32091

Last Updated 05/07/2021 07:20 AM
Project Title

Erosion and Common Area Repairs for MSTU/MSBUs on a Task Authorization Basis

Physical Address View project details and contacts
City, State (County) Kissimmee, FL   (Osceola County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Minority and Woman-owned Business Enterprise (MWBE) and Local Small Business Enterprise Programs (LSBE) with Combined Goal - 25% Repair of eroded areas around storm water ponds. Installation of riprap to repair or prevent erosion. Removal of silt or sediment from pipes or other storm water structures. Removal of brush and other vegetation from the storm water structures. Repair or replacement of missing grates, missing bolts or other parts. Repair or replacement of missing fish barriers. Fabrication and installation of missing skimmers. Removal and proper disposal of trash or other debris from storm water ponds.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents