Similar Projects
Roadway Signing, Traffic Signal
Results
Less than $1,500,000 est. value

BRT East Transportation Signal Priority (TSP) Installation
Results
$2,142,727 est. value
Jacksonville, FL

Safety Project/Milling and Resurfacing/Lighting/Traffic Signals
Results
$1,725,893 est. value

Gate Parkway Traffic Calming Project
Results
Jacksonville, FL

Traffic Signal
Infrastructure
Results

Milling and Resurfacing/Lighting/Drainage Improvements/Traffic Signals
Infrastructure
Results
$3,918,617 est. value
FL

San Pablo Road South Widening Project
Infrastructure
Results
Jacksonville, FL 32214

Traffic Signal Preventive Maintenance
Infrastructure
Results
Jacksonville, FL

Traffic Signal Unit Price Construction Countywide
Infrastructure
Results
Jacksonville, FL

Traffic Signal, Maintenance of Traffic, Electrical Work
Infrastructure
Results
$847,037 est. value
FL

Design-Build Services for Horizontal/Civil Engineering (Horizontal) Projects
Infrastructure
Results
Jacksonville, FL

Traffic Signals, Lighting and Pavement Markings- SR 101
Infrastructure
Results
$1,171,151 est. value
FL

Maintenance of Traffic
Infrastructure
Results
$650,000 est. value

Traffic Signals/Lighting/Milling and Resurfacing- SR 134
Infrastructure
Results
$2,621,768 est. value
FL

Bay Street from I-95 to Festival Park Drive
Infrastructure
Results
Jacksonville, FL 32202

Reported 06/16/2022 12:00 AM
Project Title

Hodges Boulevard and Hunt Club Road Signalization Traffic Engineering

Physical Address View project details and contacts
City, State (County) Jacksonville, FL 32224   (Duval County)
Category(s) Heavy and Highway
Sub-Category(s) Traffic Signalization
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $353,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work covered by these plans and specifications consists of furnishing all labor, materials and equipment; and performing all operations necessary for the construction of Hodges Blvd & Hunt Club Rd Traffic Signal Construction, as specified in the Contract Documents. The work includes, but is not limited to, mast arms, traffic signals, pedestrian poles, fiber optic cable, electrical cable, ITS poles and devices, ADA curb ramps, and pavement markings and all other devices and components shown in accordance with the Contract Drawings and Specifications. (Exhibit B - plans). Upon completion, a set of "as built" plans must be provided to the Traffic Engineering Project Manager.

Details

Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents