Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Lynn Lane Trunk Sewer Replace - S.1609 - Construction
Infrastructure
Conception
$1,874,896 est. value
Broken Arrow, OK 74012

Construction of Concrete Ramp
Infrastructure
Design
$247,300 CJ est. value
Tulsa, OK 74105

Intersection Modification and Traffic Signals City Street (South Memorial Drive): at the Intersection of East 126th Street South in Bixby
Infrastructure
Design
$886,711 CJ est. value
Tulsa, OK 74133

2" Waterline Replacement
Infrastructure
Bidding
Tulsa, OK

A.B. Jewell Water Treatment Plant Sodium Hydroxide and Powdered Activated Carbon Feed Systems Improvements
Renovation
Bidding
$500,000 CJ est. value
Tulsa, OK 74134

Tulsa County Sheriff Office New Administration Building
New Construction, Infrastructure - 11,250 SF
Sub-Bidding
$3,000,000 CJ est. value
Tulsa, OK 74104

Saint Francis Hospital South Expansion and Renovation - BP #1.2 - Site Landscaping and Irrigation
Infrastructure
Sub-Bidding
$1,100,000 CJ est. value
Tulsa, OK 74136

Commercial Inspection Facility
New Construction, Infrastructure - 300 SF
Post-Bid
$5,000,000 CJ est. value
Tulsa, OK 74115

Arterial Street Rehabilitation and Waterline Replacement
Infrastructure
Post-Bid
Tulsa, OK 74127

Lynn Lane Wastewater Treatment Plant Disinfection Improvements
Renovation
Results
Broken Arrow, OK 74012

CDBG Water Line Replacement
Infrastructure
Results
Sand Springs, OK 74063

WeConnect Office Expansion
Demolition, Renovation, Infrastructure - 866 SF
Pending Verification
$40,000 CJ est. value
Tulsa, OK 74137

Pancho Anaya Bakery
Addition, Demolition, Renovation, Infrastructure - 11,700 SF
Pending Verification
$2,394,737 CJ est. value
Tulsa, OK 74128

Haikey Creek Trunk Sewer Phase 1 - Construction - HC21010 - City of Broken Arrow
Infrastructure
Conception
$4,090,075 est. value
Broken Arrow, OK 74011

Last Updated 08/08/2022 09:39 AM
Project Title

Lynn Lane Water Reclamation Facility Flow Equalization Basin Improvements

Physical Address View project details and contacts
City, State (County) Broken Arrow, OK 74011   (Tulsa County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $1,646,183 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

LYNN LANE WRF FLOW EQUALIZATION BASIN (FEB) IMPROVEMENTS: Project includes demolition of the existing FEB asphalt and concrete liner, installing 11,310 square feet of new concrete and geomembrane FEB liners, installing a new non-potable waterline and hose connections, and installing a new return pump along with electrical and control components. The bid documents include an Alternate Bid for installing 3,890 square feet of FULL CONCRETE 6" LINER instead of the XR-5 liner material.

Details

Sewage Treatment Plant, Addition.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents